MoP - Ministry of Power
MoP - Ministry of Power
MoP - Ministry of Power
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
DETAILS OF ON-GOING AND NEW PROJECTS<br />
FOR WHICH FR/ DPR HAS BEEN FINALISED<br />
Sl. Project (Fuel)/ State Capacity XI Plan (07-12)/<br />
No. XII Plan (12-17)<br />
A Capacity under construction<br />
1 Kahalgaon-II Phase-I (Coal), Bihar 1000 500<br />
2 Kahalgaon-II Phase-II (Coal), Bihar 500 500<br />
3 Sipat-II (Coal), Chhattisgarh 1000 500<br />
4 Sipat-I (Coal), Chhattisgarh 1980 1980<br />
5 Koldam (Hydro), H.P. 800 800<br />
6 Barh (Coal), Bihar 1980 1980<br />
7 Korba-III (Coal), Chhattisgarh 500 500<br />
8 Bhilai Exp. (Coal), Chhattisgarh (JV with SAIL) 500 500<br />
9 NCTPP-II, Dadri, Uttar Pradesh 980 980<br />
10 Farakka-III (Coal), West Bengal 500 500<br />
11 Loharinag Pala (Hydro), Uttarakhand 600 600<br />
12 Tapovan Vishnugad (Hydro), Uttarakhand 520 520<br />
13 Simhadri-II (Coal), Andhra Pradesh 1000 1000<br />
14 Indira Gandhi STPP at Jhajjar (Coal),<br />
Haryana (JV with HPGCL and IPGCL)<br />
1500 1500<br />
15 Vallur Stage-I Phase-I (Coal), Tamil Nadu<br />
(JV with TNEB)<br />
1000 1000<br />
Sub Total A 13360<br />
B Capacity under ordering<br />
1 Mauda (Coal), Maharashtra 1000 1000<br />
2 Bongaigaon (Coal), Assam 750 750<br />
3 Barh-II (Coal), Bihar 1320 1320<br />
4 Nabinagar (Coal), Bihar (JV with Railways) 1000 1000<br />
5 North Karanpura (Coal), Jharkhand 1980 1980<br />
6 Kawas-II (Gas), Gujarat 1300 1300<br />
7 Jhanor Gandhar-II (Gas), Gujarat 1300 1300<br />
8 Lata Tapovan (Hydro)*, Uttarakhand 171 171<br />
Sub Total B 8821<br />
C Capacity for which FR/ DPR finalized<br />
1 Rihand-III (Coal), U.P. 1000 1000<br />
2 Vallur Stage-I Phase-II (Coal), Tamil Nadu<br />
(JV with TNEB)<br />
500 500<br />
3 Rammam-III (Hydro)*, West Bengal 120 120<br />
4 Rupsiyabagar Khasiabara (Hydro), Uttarakhand 260 260<br />
Sub Total C 1880<br />
Grand Total (A+B+C)<br />
* to be implemented by NTPC Hydro Ltd.<br />
25301<br />
83