7.2 Hydro <strong>Power</strong> Projects<br />

Koldam Hydroelectric <strong>Power</strong> Project (4x200MW) : Work<br />

is in progress on all the components <strong>of</strong> project such as dam,<br />

spillway, de-silting chamber, power house and switch yard.<br />

Filling work in dam area is in progress. Erection <strong>of</strong> electromechanical<br />

equipment has commenced in <strong>Power</strong> House.<br />

EOT crane has been erected and commissioned in service<br />

bay. Erection <strong>of</strong> penstock is in progress. Stay ring erected<br />

in two units. Occupancy in the township has commenced.<br />

Loharinag Pala HEPP (4x150 MW) : Work is in progress<br />

on all the main civil work packages viz. Head Race Tunnel<br />

(HRT), Barrages and Desilting Basin, Underground <strong>Power</strong><br />

House & Penstock. Hydro Mechanical (HM) package has<br />

been awarded and mobilization is underway and Electro<br />

Mechanical (EM) package tendering is under process.<br />

Tapovan Vishnugad HEPP (4x130 MW) : Work is in<br />

progress on all the main civil work packages viz. HRT,<br />

Barrages and Desilting Basin, Underground <strong>Power</strong> House<br />

& Penstock. HM package has been awarded in Oct. 07 and<br />

mobilization is underway and EM package tendering is<br />

under process.<br />

Rupsiabagar Khasiabara HEPP (260 MW) : DPR has been<br />

submitted to CEA for TEC in Nov. ’07. Works for land<br />

acquisition <strong>of</strong> project area and approach roads is in<br />

progress.<br />

Further, Govt. <strong>of</strong> Arunachal Pradesh has allocated two<br />

projects namely Etalin HEP (4000 MW) and Attunli HEP(500<br />

MW) to NTPC. Memorandum <strong>of</strong> Agreement (MOA) between<br />

A view <strong>of</strong> NTPC Koldam project<br />

Govt. <strong>of</strong> Arunachal Pradesh & NTPC was signed on<br />

21.09.2006 for execution <strong>of</strong> these projects.<br />

7.3 Coal Mining and Coal Washery<br />

7.3.1Coal Mining :<br />

(A) Allotment <strong>of</strong> Coal Mining Blocks :<br />

In addition to five coal blocks, allotted to NTPC in<br />

2005-06, Chatti Bariatu South coal block has been<br />

allotted by <strong>Ministry</strong> <strong>of</strong> Coal on 25.07.2007. This coal<br />

block is located in North Karanpura Coalfield in the<br />

State <strong>of</strong> Jharkhand. The share <strong>of</strong> reserves in this coal<br />

block is indicated as 354 MT.<br />

Apart from above, 2 more mine blocks at Brahmini and<br />

Chichro Patsimal in Orissa have been allotted by<br />

<strong>Ministry</strong> <strong>of</strong> Coal, for development through a 50:50 Joint<br />

Venture between NTPC and Coal India Limited.<br />

(B) Development <strong>of</strong> Coal Mining Blocks :<br />

Brief Status <strong>of</strong> Activities in Pakri-Barwadih Coal<br />

Block :<br />

For acquisition <strong>of</strong> land in mining area, Gazette<br />

notification under Section 7(i) <strong>of</strong> CBA Act has been<br />

published on 01.10.2007.<br />

For acquisition <strong>of</strong> land for Township, R&R Colony, and<br />

for setting up <strong>of</strong> infrastructures like CHP, Railway<br />

Siding, etc., notifications under Section 7 & 17 <strong>of</strong> LA<br />

Act have been published during July-August 2007.