3. Kotli Bhel IA (195 MW), Uttarakhand<br />
Implementation Agreement for the project has been signed<br />
with Govt. <strong>of</strong> Uttarakhand on 8.6.06. DPR <strong>of</strong> the project<br />
has been accorded Techno Economic clearance by CEA<br />
on 3.10.06. The forest proposal has been forwarded by<br />
State Govt. to MOEF. The site inspection report is awaited.<br />
4. Kotli Bhel IB (320 MW), Uttarakhand<br />
Implementation Agreement for the project has been signed<br />
with Govt. <strong>of</strong> Uttarakhand on 8.6.06. DPR <strong>of</strong> the project<br />
has been Techno Economically cleared by CEA on 31.10.06.<br />
<strong>Ministry</strong> <strong>of</strong> Defence has conveyed No Objection to project.<br />
Environmental clearance has been accorded by MOEF. The<br />
forest proposal has been submitted to State Forest<br />
Department.<br />
5. Kotli Bhel II (530 MW), Uttarakhand<br />
Implementation Agreement for the project has been signed<br />
with Govt. <strong>of</strong> Uttarakhand on 8.6.06. DPR <strong>of</strong> the project<br />
has been Techno Economically cleared by CEA in its<br />
meeting held on 31.10.06. <strong>Ministry</strong> <strong>of</strong> Defence vide letter<br />
dated 22.6.07 has conveyed No Objection to project.<br />
Environmental clearance has been accorded by MOEF on<br />
23.8.07. Forest proposal is under formulation and is<br />
yet to be forwarded by State Govt. to MOEF. PIB has<br />
recommended the project.<br />
PROJECTS UNDER FR/ DPR PREPARATION<br />
6. Vyasi (120 MW), Uttarakhand<br />
NHPC had prepared the DPR <strong>of</strong> the project on stand alone<br />
basis and submitted to CEA, which is under scrutiny. MOEF<br />
has accorded Environmental clearance to the project. The<br />
state Govt. is yet to forward the Forest proposal to MOEF.<br />
Government <strong>of</strong> Uttarakhand has provided draft<br />
implementation agreement for development <strong>of</strong> Lakhwar Vyasi<br />
Project as integrated project, in which Vyasi is proposed to<br />
be developed in first stage. NHPC has sent its major<br />
concerns on the clauses proposed in the draft implementation<br />
agreement to Government <strong>of</strong> Uttarakhand on 4.12.2007.<br />
7. Dibang Multipurpose (3000 MW), Arunachal<br />
Pradesh<br />
Dibang Multipurpose project has been transferred to NHPC<br />
vide Govt <strong>of</strong> India order dated 4.12.2002 under section 18 A<br />
<strong>of</strong> the then ES Act, 1948. For accord <strong>of</strong> TEC, DPR has been<br />
submitted to CEA, which is under scrutiny. EIA & EMP reports<br />
have been finalized and submitted to MOEF on 13.2.07 for<br />
initiating the process <strong>of</strong> Public consultation. Memorandum<br />
<strong>of</strong> Agreement (MoA) signed with Govt. <strong>of</strong> Arunachal Pradesh<br />
on 24.06.07 for execution <strong>of</strong> the Project on ownership basis<br />
by NHPC alone. This MOA supercedes the earlier MOU<br />
signed on 21.9.06, which interalia stated that the project will<br />
be implemented under Joint Venture between NHPC and<br />
State Govt. PIB clearance <strong>of</strong> this Project was done on<br />
28.01.2008 and on 31.01.2008 the Hon’ble Prime Minister<br />
laid the foundation stone <strong>of</strong> the project.<br />
Further, S&I works are being carried out by NHPC on following 10 projects with total capacity <strong>of</strong> 7750 MW for<br />
preparation <strong>of</strong> FR / DPR:<br />
S.No. Name <strong>of</strong> Project State Capacity (MW)<br />
1 Teesta-IV Sikkim 495<br />
2 Bursar Jammu & Kashmir 1020<br />
3 Chungar Chal Uttarakhand 240<br />
4 Garba Tawaghat Uttarakhand 630<br />
5 Khartoli Lumti Tulli Uttarakhand 55<br />
6 Lachen Sikkim 210<br />
7 Tawang-I Arunachal Pradesh 750<br />
8 Tawang-II Arunachal Pradesh 750<br />
9 Subansiri Middle Arunachal Pradesh 1600<br />
10 Subansiri Upper Arunachal Pradesh 2000<br />
TOTAL 7750<br />
The status <strong>of</strong> project under FR / DPR preparation is given below:<br />
1. Teesta-IV (495 MW), Sikkim:<br />
2. Bursar (1020 MW), J&K:<br />
Agreement for implementation <strong>of</strong> the project has been Site clearance stage-II accorded by MOEF on 14-5-02.<br />
signed between NHPC and state Govt. on 1.3.06. Site Forest clearance for area falling outside the KHANP has<br />
Clearance Stage-I & II accorded by MOEF on 6.10.05. DPR been accorded by Govt. <strong>of</strong> J&K vide letter dated 16.6.05.<br />
is under preparation.<br />
The proposal for de-reservation <strong>of</strong> forest land falling under