8 Ecological study <strong>of</strong><br />
Teesta River at<br />
Teesta V HE Project.<br />
9 National R&D Project-<br />
Development <strong>of</strong> Silt<br />
Resistant Material for<br />
Turbines <strong>of</strong> Hydro<br />
Generators<br />
mechanisms under the Kyoto Protocol<br />
(KP), 1997 that enables developing<br />
countries to assist developed countries<br />
in meeting their green house gas (GHG)<br />
emissions reduction targets. The<br />
ultimate objective <strong>of</strong> this mechanism is<br />
to stabilize GHG concentration. It has<br />
created an additional source <strong>of</strong> income<br />
for the promoters <strong>of</strong> projects that reduce<br />
green house gas emissions.<br />
NHPC has actively considered the<br />
Clean Development Mechanism (CDM)<br />
for its hydro power projects. Project Idea<br />
Notes (PINs) for 15 (Fifteen) projects<br />
have been prepared. Host Country<br />
approval for Nimoo-Bazgo (3X15 MW)<br />
and Chutak Project (4X 11 MW) in J&K<br />
State have been obtained from National<br />
CDM Authority in August 2007 .The<br />
Project Design Document (PDD) <strong>of</strong> both<br />
the projects were put on NHPC website<br />
for stake holder comments from<br />
31.10.07 to 29.11.07. Validation meeting<br />
DNV (Designated Operational Entity )to<br />
validate and verify the documents for<br />
Nimoo Bazgo and Chutak projects was<br />
held on 3.12.07.<br />
Ecological Study <strong>of</strong> hydro reservoir has<br />
been taken up to assess the role <strong>of</strong><br />
reservoir in GHG emission and its<br />
contribution to climate change. Phase-<br />
I Ecological study <strong>of</strong> Teesta river at<br />
Teesta Stage-V Hydroelectric Project<br />
has been got done by National<br />
Environmental Engineering Research<br />
Institute (NEERI), Nagpur and Phase-<br />
II ecological study is under process.<br />
National R&D Project for “Development<br />
<strong>of</strong> Silt Erosion Resistant Material for<br />
Turbines <strong>of</strong> Hydro Generators” for<br />
which NML (National Metallurgical<br />
Laboratory) Jamshedpur is the lead<br />
agency and NHPC is one <strong>of</strong> the<br />
participating agencies.<br />
Rs. 36 Lakhs as the initial contribution<br />
<strong>of</strong> NHPC was paid to CPRI, Bangalore<br />
during the FY 2005-06.<br />
NML has visited the Salal & Baira Siul<br />
<strong>Power</strong> Stations <strong>of</strong> NHPC to inspect the<br />
silt affected under water components.<br />
The matter regarding Patent &<br />
Technology Transfer Mechanism has<br />
been discussed in the 11th Meeting <strong>of</strong><br />
the SCRD held on 22.8.07.<br />
process & will be submitted to<br />
CDM EB for registration.<br />
Phase-II Ecological Study shall<br />
be taken up.<br />
Signing <strong>of</strong> the MOU between the<br />
participating organizations is<br />
under process.<br />