8 Ecological study <strong>of</strong><br />

Teesta River at<br />

Teesta V HE Project.<br />

9 National R&D Project-<br />

Development <strong>of</strong> Silt<br />

Resistant Material for<br />

Turbines <strong>of</strong> Hydro<br />

Generators<br />

mechanisms under the Kyoto Protocol<br />

(KP), 1997 that enables developing<br />

countries to assist developed countries<br />

in meeting their green house gas (GHG)<br />

emissions reduction targets. The<br />

ultimate objective <strong>of</strong> this mechanism is<br />

to stabilize GHG concentration. It has<br />

created an additional source <strong>of</strong> income<br />

for the promoters <strong>of</strong> projects that reduce<br />

green house gas emissions.<br />

NHPC has actively considered the<br />

Clean Development Mechanism (CDM)<br />

for its hydro power projects. Project Idea<br />

Notes (PINs) for 15 (Fifteen) projects<br />

have been prepared. Host Country<br />

approval for Nimoo-Bazgo (3X15 MW)<br />

and Chutak Project (4X 11 MW) in J&K<br />

State have been obtained from National<br />

CDM Authority in August 2007 .The<br />

Project Design Document (PDD) <strong>of</strong> both<br />

the projects were put on NHPC website<br />

for stake holder comments from<br />

31.10.07 to 29.11.07. Validation meeting<br />

DNV (Designated Operational Entity )to<br />

validate and verify the documents for<br />

Nimoo Bazgo and Chutak projects was<br />

held on 3.12.07.<br />

Ecological Study <strong>of</strong> hydro reservoir has<br />

been taken up to assess the role <strong>of</strong><br />

reservoir in GHG emission and its<br />

contribution to climate change. Phase-<br />

I Ecological study <strong>of</strong> Teesta river at<br />

Teesta Stage-V Hydroelectric Project<br />

has been got done by National<br />

Environmental Engineering Research<br />

Institute (NEERI), Nagpur and Phase-<br />

II ecological study is under process.<br />

National R&D Project for “Development<br />

<strong>of</strong> Silt Erosion Resistant Material for<br />

Turbines <strong>of</strong> Hydro Generators” for<br />

which NML (National Metallurgical<br />

Laboratory) Jamshedpur is the lead<br />

agency and NHPC is one <strong>of</strong> the<br />

participating agencies.<br />

Rs. 36 Lakhs as the initial contribution<br />

<strong>of</strong> NHPC was paid to CPRI, Bangalore<br />

during the FY 2005-06.<br />

NML has visited the Salal & Baira Siul<br />

<strong>Power</strong> Stations <strong>of</strong> NHPC to inspect the<br />

silt affected under water components.<br />

The matter regarding Patent &<br />

Technology Transfer Mechanism has<br />

been discussed in the 11th Meeting <strong>of</strong><br />

the SCRD held on 22.8.07.<br />

process & will be submitted to<br />

CDM EB for registration.<br />

Phase-II Ecological Study shall<br />

be taken up.<br />

Signing <strong>of</strong> the MOU between the<br />

participating organizations is<br />

under process.<br />