148<br />
S.No. Description 2006-07 2005-06 2004-05<br />
(Rs. in Crores)<br />
2003-04*<br />
C. APPLICATION OF FUNDS<br />
I Gross Fixed Assets 8177.71 7972.614 7980.288 6722.289<br />
II Less Depreciation (-) 1367.26 909.40 579.26 217.81<br />
III Net Block 6810.45 7063.215 7401.024 6504.48<br />
IV Total Fixed Assets 6989.23 7183.84 7476.48 7746.02<br />
(including capital work in<br />
progress, investments etc.)<br />
V Net Current Assets 460.26 364.09 307.09 17.41<br />
VI Misc. Expenditure 2.06 2.41 0.346 1.29<br />
TOTAL 7451.55 7550.34 7783.92 7764.72<br />
* SJVNL has started the commercial generation only in the year 2003-04.<br />
5.0 Generation<br />
Generation during the year 2004 – 05 has been 5171 MUs (Gross ) out <strong>of</strong> which 5108 MUs (Ex – Bus Bar Energy<br />
Generation ) supplied to the Northern Grid.<br />
Gross Energy Generation during the year 2005 – 06 was 4104 MUs, out <strong>of</strong> which 4055 MUs (Ex – Bus Bar Energy<br />
Generation ) supplied to the Northern Grid.<br />
Gross Energy Generation during the year 2006 – 07 was 6014 MUs, out <strong>of</strong> which 5942 MUs (Ex – Bus Bar Energy<br />
Generation ) supplied to the Northern Grid.<br />
The Gross Energy Generation during the year 2007 – 08, up to November 30, 2007, has been 5615 MUs, out <strong>of</strong> which<br />
5548 MUs (Ex – Bus Bar Energy Generation ), have already been supplied to the Northern Grid.<br />
The Nathpa Jhakri <strong>Power</strong> Station has generated 21889 MUs (Ex – Bus Bar Energy Generation Approx.) <strong>of</strong> electricity<br />
since beginning up to November 30, 2007.<br />
6.0 Progress Made During 2007 – 08:<br />
The details <strong>of</strong> the Progress made during the year 2007 – 08, in respect <strong>of</strong> Energy Generation and Capacity Addition by<br />
SJVNL, are as under:<br />
Description Target Up to Actual Balance Target Total Target<br />
Nov. 30, 2007 Achievement w.e.f. Dec. 1st, during 2007 – 08.<br />
Up to Nov. 30, 2007 2007 to March 31, 2008<br />
Gross Energy<br />
Generation During<br />
2007 – 08.<br />
5318 MU 5615 MU 1402 MU 6720 MU<br />
Capacity Addition NIL NIL NIL NIL<br />
7.0 Project Under Construction:<br />
(A) Rampur Hydro – Electric Project – RHEP ( 412 MW) ( located on river in Shimla district <strong>of</strong><br />
Himachal Pradesh )<br />
SJVNL, has already taken up the execution <strong>of</strong> the proposed 412 MW Rampur HE Project (RHEP). The proposed<br />
RHEP is a downstream development <strong>of</strong> the existing 1500 MW NJHPS and shall use the de-silted waters <strong>of</strong> the NJHPS<br />
under operation.<br />
The Salient Features <strong>of</strong> 412 MW RHEP, in brief, are as under :<br />
Head Race Tunnel - 15.088 km long, 10.50 m dia circular concrete lined<br />
<strong>Power</strong> House - Surface type 138 m L x 23.50 m W x 48 mH<br />
Capacity - 6 x 68.67 MW each = 412 MW<br />
Energy Generation - 1770 Million Units during a 90 % dependable year.