4. Innovative R&D Proposals<br />
Work regarding promotion <strong>of</strong> innovative methods <strong>of</strong> electricity generation continued and 11 proposals received from<br />
individuals/other Divisions were examined and commented upon.<br />
NATIONAL PERSPECTIVE PLAN PROJECTS INDICATING FINANCIAL AND TECHNICAL PROGRESS<br />
No. Title <strong>of</strong> the Project Project Funding Funds Released Status <strong>of</strong><br />
Project organization Sources to lead agencies the project<br />
(Rupees Lakh) (Rs. Lakh)<br />
Till 2007-2008<br />
1 Development <strong>of</strong> NML NHPC 100.00 Rs. 15 Lakhs<br />
Silt Erosion<br />
Resistant Material<br />
for Turbines <strong>of</strong><br />
Hydro generators<br />
SJVNL 50.00<br />
<strong>MoP</strong> 149.79<br />
Total 299.79<br />
Rs. 23.75 Lakgs<br />
2 National Effort to C-DAC & BHEL BHEL 192.5 C-DAC<br />
develop<br />
CDAC 125.0 Rs 15.0<br />
Technology for<br />
<strong>MoP</strong> 317.5 BHEL<br />
Custom <strong>Power</strong><br />
Devices<br />
Total 635.0 Rs. 10.0<br />
3 Development <strong>of</strong> EMCO <strong>MoP</strong> 100 Rs 18.25<br />
Superconducting<br />
EMCO 100<br />
Transformers<br />
Total 200<br />
4 To develop a ERDA PGCIL 19.0 Funds released to<br />
prototype <strong>of</strong> 132kV<br />
<strong>MoP</strong> nil ERDA by CPRI<br />
Optical Current<br />
Transformer for<br />
use in the 132kV<br />
system<br />
Total 19.0 Rs. 3.8 lakh.<br />
5 A study on the<br />
characteristics <strong>of</strong><br />
different types <strong>of</strong><br />
power coals for<br />
blending /<br />
beneficiation<br />
CFRI NA<br />
6 R&D projects in<br />
<strong>Power</strong> system<br />
stability<br />
IIT Kanpur NA<br />
Project team members from<br />
NML visited the field sites at<br />
Salal and Baira-Siul hydro<br />
power stations and collected<br />
the required sample and<br />
analysis is in progress. MoU<br />
to be signed as IPR issues to<br />
be resolved.<br />
MoU signed. Preliminary<br />
measurements at site were<br />
taken. Hardware development<br />
activities started by BHEL at<br />
Bangalore & Hyderabad.<br />
MoU signed. Detailed<br />
literature survey completed.<br />
Procurement <strong>of</strong> super<br />
conducting elements is in<br />
progress.<br />
MoU signed<br />
Initial experiments for current<br />
measurement using<br />
polarization effect have been<br />
completed.<br />
SFC recommended NTPC to<br />
fund. NTPC has executed a<br />
similar project hence not<br />
being taken up.<br />
SFC recommended that<br />
PGCIL to contribute 50% <strong>of</strong><br />
the project cost.