GENERATION AND POWER SUPPLY POSITION<br />

Particulars 2006-07 2007-08 Target<br />

(till Nov’06) (till Nov’07) (Dec’07 to Mar’08)<br />

1. Generation (MU)<br />

(i) Thermal 8620 9596 5312<br />

(ii) Hydel 306 365 41<br />

TOTAL 8926 9961 5353<br />

2. Thermal PLF (%) 66.61 74.15 -<br />

3. Purchase <strong>of</strong> <strong>Power</strong> (at DVC Bus) (MU) 737 554 -<br />

4. Total Stock (at DVC Bus)(MU) 8503 9572 -<br />

5. Saleable Units (at DVC Bus) (MU) 8303 9361 5311<br />

CAPACITY ADDITION PROGRAMME AND ACHIEVEMENTS<br />

10th Plan <strong>Power</strong> Projects <strong>of</strong> DVC<br />

Project Capacity Progress Status as on Target COD<br />

(MW) 30.11.2007 & January 2008.<br />

AS on 30.11.07 As on January 2008<br />

Mejia TPS Extn. 500 Unit 5: Coal synchronization Unit 5 COD: Unit 5 :<br />

Unit # 5 & 6<br />

(LOA placed<br />

(2x250) done on 24.11.2007. January 2008 January 2008.<br />

on 15.6.04) Unit 6: Oil synchronization Unit 6 COD: Unit 6 :<br />

done on 01.10.2007. February 2008 February 2008.<br />

Chandrapura 500 Construction is under progress. Unit 7: Boiler Light up Unit #7: 31.08.07<br />

TPS Extn. 2x250 Boiler Drum lifting <strong>of</strong> U#7 by Jan., 2008 Oil Unit #8: 30.09.07<br />

Unit # 7&8 completed on 25.04.06 & for synchronization by<br />

(LOA placed<br />

on 30.6.04)<br />

U#8 on 14.08.06. March 2008.<br />

Unit 8: Boiler Hydro Test Unit 8: Boiler Light up<br />

done on 02.11.07. by May, 2008 Oil<br />

synchronization by<br />

August 2008.<br />

11th Plan <strong>Power</strong> Projects <strong>of</strong> DVC<br />

Project Capacity LOA Target to be Target COD**<br />

(MW) achieved by<br />

31.3.08<br />

Mejia TPS Ph-II<br />

Main Plant Package 1000 Letter <strong>of</strong> Acceptance Boiler Drum Lifting Unit 1: 12/2009<br />

(2 x 500) placed on 14.12.06 Unit 2 : 03/2010<br />

and Letter <strong>of</strong> Award<br />

on 08.1.07. Zero<br />

Date: 31.12.06.<br />