12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating01330 – Project Schedule<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Page #:2 <strong>of</strong> 3progress <strong>of</strong> construction, and identifying the Contractor or Contractors who arenot progressing their Work as scheduled.B. Furnish all schedule information requested by the OWNER’s Representative.Any CONTRACTOR who fails to furnish this information within the specifiedtime period will be required to provide all resources necessary to execute theProject Schedule developed by the OWNER’s Representative.1.3 MAINTAINING SCHEDULEA. Perform the Work in accordance with the Project Schedule and provide resourcesnecessary to maintain the progress <strong>of</strong> activities as scheduled so that no delays arecaused to other CONTRACTORS engaged in the Work.B. Should any CONTRACTOR fail to maintain progress according to schedule orcause delay to another CONTRACTOR, that CONTRACTOR shall provide suchadditional manpower, equipment, additional shifts, or other measures as directedto bring the operations back on schedule.1.4 SCHEDULE RELATED REPORTINGA. Application For Payment: Prepare forms and support documentation in a mannercompatible with the Bid Tabulations. Show costs in support <strong>of</strong> activitiesprogressed in the Project Schedule status updates. Percentage completionamounts must reflect accepted work in place as agreed upon by the OWNER’sRepresentative and documented in project meeting schedule status reports.PART 2PART 3PRODUCTS (Not Used)EXECUTION (Not Used)3.1 ORDINARY WORKING HOURS:A. See Miscellaneous and Special Provisions in the General Conditions3.2 WATER SYSTEM WORK GENERALA. Contractor shall perform domestic water improvements in any area beforeinstalling district heating piping in those areas.3.3 WATER SYSTEM WORK SPECIALPROJECT SCHEDULE 01330 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!