12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Title:15900 – Direct Digital Control SystemPage #:37 <strong>of</strong> 40c. Test interlock actions by simulating alarm conditions to check initiatingvalue <strong>of</strong> variable and interlock action.3.6 CONTROL SYSTEM DEMONSTRATION AND ACCEPTANCEA. Demonstration. Prior to acceptance, perform the following performance tests todemonstrate system operation and compliance with specification after and in addition totests specified in. Provide OWNER’s Representative with log documenting completion<strong>of</strong> startup tests.1. OWNER’S Representative will be present to observe and review systemdemonstration. Notify OWNER’S Representative at least 10 days before systemdemonstration begins.2. Demonstration shall follow process submitted and approved Complete approvedchecklists and forms for each system as part <strong>of</strong> system demonstration.3. Demonstrate actual field operation <strong>of</strong> each sequence <strong>of</strong> operation as specified.Provide at least two persons equipped with twoway communication.Demonstrate calibration and response <strong>of</strong> any input and output points requestedby Engineer. Provide and operate test equipment required to prove propersystem operation.4. Demonstrate compliance with Section Part 1 System Performance.5. Demonstrate compliance with sequences <strong>of</strong> operation through each operationalmode.6. Demonstrate complete operation <strong>of</strong> operator interface.7. Demonstrate each <strong>of</strong> the following.a. DDC loop response. Supply graphical trend data output showing eachDDC loop's response to a setpoint change representing an actuatorposition change <strong>of</strong> at least 25% <strong>of</strong> full range. Trend sampling rate shallbe from 10 seconds to 3 minutes, depending on loop speed. Eachsample's trend data shall show setpoint, actuator position, and controlledvariable values. Engineer will require further tuning <strong>of</strong> each loop thatdisplays unreasonably under or overdamped control.b. Demand limiting. Supply trend data output showing demandlimitingalgorithm action. Trend data shall document action sampled each minuteover at least a 30minute period and shall show building kW, demandlimiting setpoint, and status <strong>of</strong> setpoints and other affected equipmentparameters.c. Trend logs for each system. Trend data shall indicate setpoints, operatingpoints, valve positions, and other data as specified in the points listprovided with each sequence <strong>of</strong> operation. Each log shall cover three 48hour periods and shall have a sample frequency not less than 10 minutesor as specified on its points list. Logs shall be accessible throughsystem's operator interface and shall be retrievable for use in others<strong>of</strong>tware programs as specified.DIRECT DIGITAL CONTROL SYSTEMS1597237

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!