12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Materials:• Construction <strong>of</strong> concrete drain structures and drain assemblies• Furnish and Install communication conduits and pull rope• Furnish and Install warning tapeAll materials necessary to install the piping system its entirety.Method <strong>of</strong> Measurement:The quantity <strong>of</strong> InFGround Hot Water Piping Pipe to be measured for payment will be the number <strong>of</strong> linear feet <strong>of</strong>trench with Hot Water Pipe from the mainline pipes to the next to last service along main laterals for customerservices installed in the complete and accepted work, as measured along the centerline between the pipes. SeeSpecification Section 033615 Hot Water Pipe Distribution System.Basis <strong>of</strong> Payment:The accepted quantity <strong>of</strong> InFGround Hot Water Service Main Lateral Pipe will be paid for at the Contract unitprice per linear foot <strong>of</strong> trench. Payment shall be full compensation for furnishing all labor, tools, equipment, andmaterials; for excavation, sheeting and bracing, dewatering, and backfilling and compaction; for installation <strong>of</strong>the pipe, including, but not limited to, pipe fitFup and placement; welding; installation <strong>of</strong> bends, tees, isolationvalves, air release valves, and other fittings as shown in the Plans; required testing <strong>of</strong> welds (dye penetrant,hydrostatic, etc.); pipe cleaning; insulation and sealing <strong>of</strong> each joint, including but not limited to insulationinstallation, sleeve installation, and joint sealing; expansion board furnish and installation; construction <strong>of</strong> thealarm wiring system, including but not limited to all testing, solder, wire stand<strong>of</strong>fs, crimping tools, and buttconnectors; installation <strong>of</strong> conduit pipe and handholes; fiber optic installation; warning tape installation; 24”subbase <strong>of</strong> dense graded crushed stone; protective HSF25 slabs with castings, standpipes, and adjustmentrings; and all asFbuilt requirements as outlined in Section 01710 – Project Closeout Requirements, the pipebedding and any necessary borrow materials to bring the grade above the pipe to either the ground surface orthe subgrade elevation below any pavement surface to be placed above the pipe at that location; for restoration<strong>of</strong> physical features; and for all work required for a complete installation <strong>of</strong> Pipe system shown on the Plans.Grubbing, erosion control, excavation, excavation support, dewatering, backfilling, compaction, hydrostatic ordye penetrant testing and flushing; preparing and furnishing required submittals, reports, and asFbuilt drawings;and for furnishing all labor, materials, tools, equipment, and incidentals necessary to complete the work shallnot be paid for separately, but shall be included in the contract unit price for this item.Equipment:As needed.Bid Item 12 – Valve and Air Release StructuresDescription:In general, this work shall consist <strong>of</strong> the construction <strong>of</strong> the access structures for all valves and air releases asshown and detailed on the Plans; and the furnishing and placing <strong>of</strong> cast iron frames and cast iron covers to meetthe elevations shown on the plans.Method <strong>of</strong> Measurement:The quantities <strong>of</strong> new structures to be measured for payment will be the number <strong>of</strong> units <strong>of</strong> the respective typesused in the complete and accepted work.Basis <strong>of</strong> Payment:The accepted quantities <strong>of</strong> new Air Release Valves and Manholes will be paid at the Contract unit price per unit.Payment will be full compensation for furnishing, transporting, handling, and placing the materials specified,including rigid polystyrene insulation, SCH 80 PVC standpipe, concrete slab, concrete risers, top sections,reinforcing steel, mortar, brick, frames, and covers, and for furnishing all labor, tools equipment and incidentalsnecessary to complete the work. Excavation, 24” subbase <strong>of</strong> dense graded crushed stones, compaction <strong>of</strong>subbase, placing <strong>of</strong> the structure, backfill and compaction necessary to complete the manhole installation shallbe included in the contract unit price for this item.Equipment:^ As needed, such as excavator, backhoe, trench boxes, miscellaneous safety equipment, etc.Bid Item 13 – Construct Drain AssemblyDescription:<strong>Montpelier</strong> District Heat SystemPage 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!