12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Materials:• Purchase, shipment, and construction <strong>of</strong> interior service entry valves and shunt assembly• Furnish and Install communication conduits and pull rope• Furnish and Install warning tape• Remove existing concrete sidewalk• Remove existing bituminous concrete paving• Remove (and reset) existing granite curb• Remove existing sod and topsoil• Purchase and shipment <strong>of</strong> piping• Purchase and shipment <strong>of</strong> pipe fittings (including the tee in the main associated with the service lateral)• Purchase and shipment <strong>of</strong> valves• Restoration <strong>of</strong> existing surface conditions, complying with the project documentsAll materials necessary to install the service lateral in its entirety.Method <strong>of</strong> Measurement:The quantity <strong>of</strong> InFGround Hot Water Piping Pipe will be paid at the Lump Sum bid for the Customer ServiceLateral or Spur. See Division II, Specification Section 033615 Hot Water Pipe Distribution System.Basis <strong>of</strong> Payment:The accepted quantity <strong>of</strong> Customer Service will be paid for at the Lump Sum Contract price for construction <strong>of</strong>the service to the designated building. Payment shall include all labor, equipment, and materials necessary forthe installation <strong>of</strong> the identified size <strong>of</strong> hot water pipe, including, but not limited to: excavation, bedding, andbackfill; compaction; expansion board installation; pipe fitFup and placement; welding; installation <strong>of</strong> bends,tees, isolation valves, air release valves, and other fittings as shown in the Plans; required testing <strong>of</strong> welds (dyepenetrant, hydrostatic, etc.); pipe cleaning; insulation and sealing <strong>of</strong> each joint, including but not limited toinsulation installation, sleeve installation, and joint sealing; construction <strong>of</strong> the alarm wiring system, includingbut not limited to all testing, solder, wire stand<strong>of</strong>fs, crimping tools, and butt connectors; installation <strong>of</strong> conduitpipe, handholes, and junction boxes inside each building; fiber optic installation; warning tape installation;service entry core drilling and sealing; the full installation <strong>of</strong> service entry, including but not limited to valves,shunt assemblies, and insulation, per Detail XX in the Plans; and all asFbuilt requirements as outlined in Section01710 – Project Closeout Requirements. Payment for this Bid Item shall also include all surface restorationrequired to replace disturbed surface features along the pipe excavation, according to the standards establishedby <strong>Montpelier</strong> Department <strong>of</strong> Public Works.If the <strong>City</strong>FOwned Main piping moves during construction and the service lateral or spur length must increase oraccommodate the change, the additional monies will be calculated based on the lengths and the pay items forsameFdiameter <strong>City</strong> Owned Main piping.Equipment:As needed.^ Item 150 < Bituminous Pavement Overlay, Fairpoint Parking LotA. Description:This item consists <strong>of</strong> furnishing, laying and compacting a single 1 ½” thick lift <strong>of</strong> VTrans wearing course TypeIII mix wich shall be placed as directed by the engineer. The contractor shall accomplish any necessaryleveling <strong>of</strong> the base course, patching or repairing, with Type II binder mix unless otherwise indicated on theplans or as directed by the Enineer. Pror to placing any material on the original base course, the survaceshall be cleaned and a tack coat <strong>of</strong> bitumionous material applied for bonding purposes.1. All valve boxes, service boxes, manhole covers, catchbasin grates and rims shall be adjusted to meetfinal grade by the Contractor. Care shall be taken to insure these facilities remain free frompavement or debris during construction.2. All pavement markings shall be reapplied to the final surface as directe by the Engineer.3. Installation <strong>of</strong> bituminous concrete pavement shall be in accordance with Specification Section<strong>Montpelier</strong> District Heat SystemPage 72

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!