price per linear foot <strong>of</strong> trench. Payment shall be full compensation for furnishing all labor, tools, equipment, andmaterials; for excavation, sheeting and bracing, dewatering, and backfilling and compaction; for installation <strong>of</strong>the pipe, including, but not limited to, pipe fitFup and placement; welding; installation <strong>of</strong> bends, tees, isolationvalves, air release valves, and other fittings as shown in the Plans; required testing <strong>of</strong> welds (dye penetrant,hydrostatic, etc.); pipe cleaning; insulation and sealing <strong>of</strong> each joint, including but not limited to insulationinstallation, sleeve installation, and joint sealing; expansion board furnish and installation; construction <strong>of</strong> thealarm wiring system, including but not limited to all testing, solder, wire stand<strong>of</strong>fs, crimping tools, and buttconnectors; installation <strong>of</strong> conduit pipe and handholes; fiber optic installation; warning tape installation; 24”subbase <strong>of</strong> dense graded crushed stone; protective HSF25 slabs with castings, standpipes, and adjustmentrings; and all asFbuilt requirements as outlined in Section 01710 – Project Closeout Requirements, the pipebedding and any necessary borrow materials to bring the grade above the pipe to either the ground surface orthe subgrade elevation below any pavement surface to be placed above the pipe at that location; for restoration<strong>of</strong> physical features; and for all work required for a complete installation <strong>of</strong> Pipe system shown on the Plans.Grubbing, erosion control, excavation, excavation support, dewatering, backfilling, compaction, hydrostatic ordye penetrant testing and flushing; preparing and furnishing required submittals, reports, and asFbuilt drawings;and for furnishing all labor, materials, tools, equipment, and incidentals necessary to complete the work shallnot be paid for separately, but shall be included in the contract unit price for this item.Equipment:As needed.Bid Item 8 – In

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!