12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT15995 – Commissioning <strong>of</strong> Mechanical SystemsIssue Date:September 28, 2012Page #:1 <strong>of</strong> 7REVISION HISTORYRev Description <strong>of</strong> Change DateA For Bidding September 28, 2012SECTION 23 08 00 COMMISSIONING OF MECHANICAL SYSTEMSPART 1GENERAL1.1 RELATED DOCUMENTSA. Drawings and general provisions <strong>of</strong> the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to thissection.B. In addition to the drawings and general provisions <strong>of</strong> the contract, commissioningrequirements are defined in the following sections:1.2 SUMMARY1. Section 019110 – General Commissioning Requirements2. Section 230800 – Mechanical System Commissioning RequirementsA. This section includes commissioning process requirements for mechanical systems, assemblies, and equipment.B. General commissioning requirements are described in Division 01 Section019110 and are therefore not repeated in this Section.1.3 SYSTEMS TO BE COMMISSIONEDA. Commissioning <strong>of</strong> the mechanical systems shall include:1. All newly installed mechanical systems2. All modified mechanical systems3. All new and modified control systemsB. The State is constructing the central plant and heat exchange equipment. They areMECHANICAL SYSTEM COMMISSIONING REQUIREMENTS 15995 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!