12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating01705 – Field Engineering<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Page #:2 <strong>of</strong> 2C. Where identified in the plan drawings, digital reference <strong>of</strong> benchmarks to beutilized for layout <strong>of</strong> the Work.All data will be transmitted via the project’s electronic submittal website.1.4 CONTRACTOR’S RESPONSIBILITIESThe CONTRACTOR shall provide field engineering and layout services for completion<strong>of</strong> the Work including, but not limited to:A. Establishing and maintaining all controls, lines, and levels for the Work.B. Employ a Registered Pr<strong>of</strong>essional Land Surveyor to replace any monuments,property corners, or reference points moved or destroyed in the course <strong>of</strong>performing the Work.C. Designing shoring, forms, and similar items that are supplied by theCONTRACTOR as part <strong>of</strong> the means and methods for construction <strong>of</strong> the Work.Where required by jurisdiction, local authorities, or required as part the ContractDocuments, provide certified drawings to the authority requesting said drawings.D. Verify existing conditions and dimensions indicated in the plan drawings arecorrect. The CONTRACTOR shall notify the OWNER in writing <strong>of</strong> anydiscrepancies in the existing conditions that may impact the construction <strong>of</strong> theWork.E. Lay out building foundations, column locations, and floor elevations for allbuilding service entries. Verify the elevations as proposed in the plan drawingsare correct through nondestructive means. Service entry locations shall beverified by drilling a pilot hole through the foundation wall prior to core drillingservice sleeves or removing foundation wall brick, mortar, stone, or concrete.F. Provide and maintain onsite for the OWNER’s review a complete and accuratelog <strong>of</strong> control and survey information for the Work. This log shall containbenchmark information and control points utilized for laying out the Work, andshall be submitted in accordance with Section 01340 – Submittals.G. Provided record documentation and asbuilt documentation as detailed in Section01710 – Closeout Procedures.PART 2PART 3– PRODUCTS – NOT USED– EXECUTION – NOT USEDEND OF SECTION 01705FIELD ENGINEERING017052

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!