12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:01340 – Submittals<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Page #:2 <strong>of</strong> 12is equal to the specified product. The submission <strong>of</strong> an “or equal” shall bedone in a timely manner to allow the ^ Owner sufficient time to review theproposed product.2. Whenever a color or pattern is indicated by a specific manufacturer’sname or number, the intent is to communicate the required color or pattern<strong>of</strong> the material. Other manufacturers’ comparable colors or patterns maybe submitted for approval as equal.1.5 WAIVER OF CERTAIN SUBMITTAL REQUIREMENTSA. Unless otherwise specified, the requirement to submit product data and samplesfor approval will be waived for products specified by brand name if thespecifically named products are furnished for the Work. In such cases, submitrequired Product Data to the ^ Owner’s Representative via the Submittals Websitefor information only.1.6 ADMINISTRATIVE REQUIREMENTSA. Identify all submittals by project title and number. Include Contractor’s name,date, and revision date. On shop drawings, product data and samples, also includethe name <strong>of</strong> the supplier and subcontractor (if any), and applicable specificationsection number, drawing number or addendum number. Stamp each submittaland initial or sign the stamp to certify review and approval <strong>of</strong> submittal.B. Assemble submittals in accordance with the requirements in the individualsections <strong>of</strong> the <strong>Specifications</strong> and as required by this section. It is the Contractor'sresponsibility to review and verify that all information required for each submittalis included in the submittal package. Errors or omissions found by the Contractorare to be corrected prior to the submission <strong>of</strong> the submittal package for approval.Incomplete submittal packages that have been submitted for review and approvalwill be returned.SUBMITTALS 01340 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!