12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT019110 – General Commissioning RequirementsIssue Date:October 17, 2012Page #:25 <strong>of</strong> 30C. Failure Due to Manufacturer Defect. The majority <strong>of</strong> manufacture defects are expected to be identified by the contractor during testing and checkout. If 10% (orthree, whichever is greater) <strong>of</strong> identical pieces <strong>of</strong> equipment fail to perform to thecontract documents (mechanically or substantively) due to a manufacturing defect, not allowing it to meet its submitted performance specification, all identicalunits may be considered unacceptable by the engineer or CxA. In such case, thecontractor shall provide the Owner with the following:1. Within one week <strong>of</strong> notification from the Owner/CM, the contractor ormanufacturer’s representative shall examine all other identical units making a record <strong>of</strong> the findings. The findings shall be provided to the CMwithin two weeks <strong>of</strong> the original notice.2. Within two weeks <strong>of</strong> the original notification, the contractor or manufacturer shall provide a signed and dated, written explanation <strong>of</strong> the problem,cause <strong>of</strong> failures, etc., and all proposed solutions. The proposed solutionsshall not significantly exceed the specification requirements <strong>of</strong> the originalinstallation.3. The engineer will determine whether a replacement <strong>of</strong> all identical units ora repair is acceptable.4. Two examples, where applicable, <strong>of</strong> the proposed solution shall be installed by the contractor and the engineer shall be allowed to test the installations for up to one week, upon which the engineer will decide whether to accept the solution.5. Upon acceptance, the contractor and/or manufacturer shall replace or repair all identical items, at their expense. The replacement/repair workshall proceed with reasonable speed beginning within one week fromwhen parts can be obtained.D. Approval. The CxA notes each satisfactorily demonstrated function on the testform. Final approval <strong>of</strong> the performance test by the Owner is made after reviewby the CxA and CM, following recommendations by the engineer.3.7 DEFERRED TESTINGGENERAL COMMISSIONING REQUIREMENTS 01910 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!