12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating16100 – Site Electrical<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Page #:8 <strong>of</strong> 8A. Pull Fiber Optic cable as shown on the project drawings.B. Fiber Optic cable shall be pulled through the provided conduits by means <strong>of</strong> theprovided nylon pull string from each handhole connection and each buildingservice entry.C. The CONTRACTOR shall use force indicators to ensure that the rated pullstrength <strong>of</strong> the fiber is not exceeded at any time during the pulling process.3.7 BACKFILLING AND IDENTIFICATION REQUIREMENTSA. Backfilling is described in Section 02200 – Earthwork.1. Conform to ASTM D2321 when backfilling plastic pipe.B. Buried conduit warning tape is described in Part 2.5 <strong>of</strong> this Specification.C. Location <strong>of</strong> conduit where it deviates from that shown in the plans shall beincluded in the conduit drawing on the AsBuilt Documentation in accordancewith Section 01710 – Project Closeout Requirements, Part 1.5.END OF SECTION 16100SITE ELECTRICAL161008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!