12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT15010 – Basic Mechanical RequirementsIssue Date:September 28, 2012Page #:3 <strong>of</strong> 13shall be adequately protected against wear by bushings or other approved means.Provisions shall be made for adequate lubrication with readily accessible devices.B. Ample clearance shall be provided for repairs, inspection and adjustment.Protruding members such as joints, corners and gear covers shall be finished inappearance. All exposed welds shall be ground smooth and the corners <strong>of</strong>structural shapes shall be rounded or chamfered.C. All machinery and equipment shall be safeguarded in accordance with the safetycodes <strong>of</strong> the ANSI, OSHA, and local industrial codes, including but not limitedto, shaft guards on all rotating shafts.D. Secure and pay for all necessary fees, permits and approvals, as required for thework <strong>of</strong> this Section.E. Before commencing work, review the project with the Local and State inspectors.Conform, in every respect, with their separate recommendations, unless therecommendations are inferior to, or in conflict with, the Contract Documents, thenOWNER’S Representative acceptance will be required before proceeding with thework.F. All mechanical work shall be performed by mechanics who are qualified to dosuch work and who are normally engaged in this type <strong>of</strong> work. Because <strong>of</strong> thecomplexity <strong>of</strong> the mechanical work, unskilled labor is not permitted1.5 COORDINATIONIt is the responsibility <strong>of</strong> the mechanical contractor to coordinate the work <strong>of</strong> histrade with all other trades prior to the commencement <strong>of</strong> construction. TheDrawings are schematic in nature, not all fittings and <strong>of</strong>fsets are shown. It is theresponsibility <strong>of</strong> the Contractor to provide, in his original bid, all necessary<strong>of</strong>fsets, fittings, and transformations to provide a complete project. Any conflictsmust be brought to the attention <strong>of</strong> the OWNER’S Representative. Any workrequiring removal and reinstallation due to the lack <strong>of</strong> coordination shall be theresponsibility <strong>of</strong> the Contractor with no additional cost to the Owner. Do notlocate any piping over electrical equipment.A. Prepare coordination drawings in accordance with to a scale <strong>of</strong> 3/8"=1'0" orlarger; detailing major elements, components, and systems <strong>of</strong> mechanicalequipment and materials in relationship with other systems, installations, andbuilding components. Indicate locations where space is limited for installationand access and where sequencing and coordination <strong>of</strong> installations are <strong>of</strong>BASIC MECHANICAL REQUIREMENTS150103

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!