12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT33615 – Hot Water Pipe Distribution SystemIssue Date:September 25, 2012Page #:15 <strong>of</strong> 18B. Leak Detection System wiring is preinstalled in the piping system. Wirestand<strong>of</strong>fs (chairs) and specified electrical equipment to be provided by theCONTRACTOR.C. The CONTRACTOR shall electrically test the leakdetection wiring in each pipelength and fitting that has been installed by the piping manufacturer for thepresence <strong>of</strong> moisture, and continuity. The test shall be conducted with a devicecapable <strong>of</strong> applying a voltage <strong>of</strong> 1000 volts for a period <strong>of</strong> 1 minute, andproviding a reading <strong>of</strong> up to a minimum <strong>of</strong> 500 MX. The test parameters for eachpiece <strong>of</strong> preinsulated hot water pipe and hot water fittings shall be as follows:• Voltage Value. .................1000 V applied for minimum <strong>of</strong> 1 minute• Resistance. .......................Minimum <strong>of</strong> 500 MXThe results <strong>of</strong> the electrical test shall be marked on each pipe length or fitting withthe date <strong>of</strong> the test, test results and the individual performing the test and reportedto the OWNER’S Project Representative on the Alarm Wire Test Form –Resistance (see Appendix B) prior to the installation <strong>of</strong> each pipe section.D. Wire connections at pipe joints shall be mechanically crimped and soldered usingnoninsulated butt connectors, and flux core solder. The wires shall be evenlyspaced in the foam or plastic chairs and securely taped to the steel pipe insufficient quantity to prevent the wires from contacting the steel pipesE. Electrical equipment and connections required for the operation <strong>of</strong> the systemshall be installed as shown in the Plans.F. The CONTRACTOR shall take required special precautions to prevent moisturefrom entering the piping foam at the pipe joints. At no additional cost to theOWNER, the CONTRACTOR shall correct wiring joints that indicate thepresence <strong>of</strong> moisture.G. The CONTRACTOR shall electrically test all wiring, equipment, and theoperation <strong>of</strong> the newly constructed portion <strong>of</strong> the leakdetection system. Theresults <strong>of</strong> the electrical tests shall be documented and reported to the OWNER’SProject Representative prior to the foaming and closing <strong>of</strong> the pipe joints. Contactthe OWNER’S Project Representative to verify all alarm loop wiring isacceptable.H. Upon completion <strong>of</strong> the insulation joints by the CONTRACTOR, the “PipelineAlarm Loop Test” will be conducted by the OWNER’S personnel and witnessedby the CONTRACTOR. The Pipeline Alarm Loop Test shall consist <strong>of</strong> thefollowing requirements:1. Upon completion <strong>of</strong> the wire connections and insulation joints by theCONTRACTOR, a final test will be conducted by the Owner’s representativeHOT WATER PIPE DISTRIBUTION SYSTEM3361515

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!