12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT15010 – Basic Mechanical RequirementsIssue Date:September 28, 2012Page #:12 <strong>of</strong> 13D. Furnish, install and protect all necessary guides, bearing plates, anchor andattachment bolts, and all other appurtenances required for the installation <strong>of</strong>equipment. These shall be <strong>of</strong> ample size and strength for the purpose intended.E. Anchor bolts shall be furnished and built into the concrete foundations.F. All equipment shall be installed in such a manner as to provide access for routinemaintenance, including lubrication.G. Structural steel supports and miscellaneous steel required for supporting and/orhanging equipment and piping furnished under this Division, shall be providedand installed.H. All foundations, anchor pads, piers, thrust block, inertia blocks and structural steelsupports shall be built to template and reinforced as required for loads imposed onthem.I. Assume all responsibility for sizes, locations, and design <strong>of</strong> all foundations,anchor pads, piers, thrust blocks, inertia blocks, curbs and structural steelsupports.3.7 CLEANINGA. Protect equipment against mortar, dust, weather, etc., during construction andleave all equipment clean. Remove from the premises, all debris and unusedmaterial and leave premises in a clean and neat condition.B. Inspect all items <strong>of</strong> equipment thoroughly. Repair any items dented, scratched, orotherwise damaged in any manner and paint to match original finish. All items sorepaired and refinished shall be brought to the attention <strong>of</strong> the OWNER’SRepresentative for inspection and approval.3.8 GUARANTEEA. Guarantee all work and equipment installed under this Section <strong>of</strong> the<strong>Specifications</strong> against any defects which may occur during one year periodstarting from day <strong>of</strong> final acceptance. Guarantee all other work and damage as aresult <strong>of</strong> such defects. Coordinate with the General Contractor for requirements<strong>of</strong> guarantee.BASIC MECHANICAL REQUIREMENTS1501012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!