12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:02200 – Earthwork<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Page #:12 <strong>of</strong> 161. Stockpile soil materials away from edge <strong>of</strong> excavations. Do not store within dripline <strong>of</strong> remaining trees. Encircle all stockpiles with silt fence.3.11 BACKFILLA. Backfill excavations promptly, but not before completing the following:1. Acceptance <strong>of</strong> construction below finish grade including, where applicable,damppro<strong>of</strong>ing, waterpro<strong>of</strong>ing, and perimeter insulation.2. Surveying locations <strong>of</strong> underground utilities for record documents.3. Testing, inspecting, and approval <strong>of</strong> underground utilities.4. Concrete formwork removal.5. Removal <strong>of</strong> trash and debris from excavation.6. Removal <strong>of</strong> temporary shoring and bracing, and sheeting.7. Installing permanent or temporary horizontal bracing on horizontally supportedwalls.3.12 UTILITY TRENCH BACKFILLA. Place and compact bedding course on rock and other unyielding bearing surfaces and t<strong>of</strong>ill unauthorized excavations. Shape bedding course to provide continuous support forbells, joints, and barrels <strong>of</strong> pipes and for joints, fittings, and bodies <strong>of</strong> conduits.B. Place and compact initial backfill to a height <strong>of</strong> 12 inches over the utility pipe or conduit.1. Carefully compact material under pipe haunches and bring backfill evenly up on bothsides and along the full length <strong>of</strong> utility piping or conduit to avoid damage ordisplacement <strong>of</strong> utility system.C. Coordinate backfilling with utilities testing.D. Fill voids with approved backfill materials as shoring and bracing, and sheeting isremoved.E. Place and compact final backfill to final subgrade.F. Install warning tape directly above utilities, 12 inches below finished grade, except 6inches below subgrade under pavements and slabs. A metal trace wire is to be installedabove the effluent force main.3.13 FILLA. Preparation: Remove vegetation, topsoil, debris, wet, and unsatisfactory soil materials,obstructions, and deleterious materials from ground surface prior to placing fills.EARTHWORK 02200 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!