12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Title:APPENDIX A – Welding and Testing RequirementsPage #:17 <strong>of</strong> 22welder, until five joints in succession are satisfactory; however, a minimum <strong>of</strong> 6'<strong>of</strong> weld length shall be tested.6.4 When all joints in the expanded inspection are satisfactory, the inspection shallrevert to 10 percent minimum random sampling.6.5 When defects are detected regularly, or when welding is carried out under poorconditions, the ENGINEER may expand radiographic control to 100 percent atthe CONTRACTOR’s expense, with notification in writing thereto.7.0 RECORDS AND SUBMITTALS7.1 Copies <strong>of</strong> the following documents shall be submitted to the ENGINEER forreview and release:7.1.1 Paragraph 1.3 Radiography procedure7.1.2 Personnel Certifications;7.1.3 Radiographic reader sheets, including film interpretation;7.1.4 Radiographic Shooting Sketch (RSS) (see attached sample form inAppendix B).7.2 One radiographic film <strong>of</strong> each radiographed location shall be submitted tothe ENGINEER for review and release.7.2.1 Included with the films shall be all radiographic films containingdiscontinuities requiring repair.7.2.2 All radiographic films, including tracer and repair films, taken on thepiping systems are the sole property <strong>of</strong> Owner.7.3 Each document and film shall contain, but not be limited to, the followingidentifying information:7.3.1 Client Name (Owner)7.3.2 Identification <strong>of</strong> the Piping System (Project Number)7.3.3 Date <strong>of</strong> Radiography7.3.4 Manufacturer's Name or Symbol7.3.5 Weld Identification Number7.3.6 Welder Identification7.3.7 Signature <strong>of</strong> Interpreter7.3.8 Examination Procedure Number7.4 The CONTRACTOR shall obtain verification from the OWENR’S Representativethat all radiography is completed in accordance with the specifications and isacceptable.IV.LIQUID PENETRATION EXAMINATION OF PIPING WELDSWhere required as part <strong>of</strong> the construction contract, the CONTRACTOR shall be responsible fornotification to the <strong>City</strong> <strong>of</strong> <strong>Montpelier</strong> Mechanical Inspection Department <strong>of</strong> all proposed liquidpenetration testing.The CONTRACTOR is responsible for all costs associated with liquid penetration testing. TheCONTRACTOR shall refer to Appendix A, Section II, Paragraph 18.1.3. for the use <strong>of</strong> liquidpenetration testing in lieu <strong>of</strong> hydrostatic testing.APPENDIX APage A17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!