12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT019110 – General Commissioning RequirementsIssue Date:October 17, 2012Page #:7 <strong>of</strong> 30GG.HH.II.JJ.system’s sequences <strong>of</strong> operation and components are verified to respond as thesequences state.Training Plan A written document that details the expectations, schedule, budget, and deliverables <strong>of</strong> commissioning process activities related to training <strong>of</strong> project operating and maintenance personnel, users, and occupants.Verification The process by which specific documents, components, equipment,assemblies, systems, and interfaces among systems are confirmed to comply withthe criteria described in the Owner’s Project Requirements.Trending – The monitoring, by a building management system or other electronicdata gathering equipment, and analyzing <strong>of</strong> the data gathered over a period <strong>of</strong>time.Vendor Supplier <strong>of</strong> equipment.1.6 COORDINATIONA. Project Commissioning Team The members <strong>of</strong> the project commissioning teamwill consist <strong>of</strong> the commissioning authority and any support personnel, the construction manager, the Owner’s facility staff or designee, the general contractor,subcontractors and/or vendors as required, and engineer.B. Management The CxA coordinates the commissioning activities through theOwner or the construction manager. All members shall work together to fulfilltheir contracted responsibilities and meet the objectives <strong>of</strong> the contract documents.C. Scheduling The CxA, through the Owner or CM, will provide sufficient noticeto the contractor for scheduling commissioning activities with respect to theOwner’s participation. The contractor will integrate all commissioning activitiesinto the overall project schedule. All parties will address scheduling problems andmake necessary notifications in a timely manner in order to expedite the commissioning process.1.7 COMMISSIONING PLANA. The CxA will develop the commissioning plan which shall be included in the project schedule when approved by the Owner. The following narrative provides abrief overview <strong>of</strong> the typical commissioning tasks during construction and thegeneral order in which they occur.1. Commissioning during construction begins with an initial commissioningmeeting conducted by the CxA where the commissioning process is reGENERAL COMMISSIONING REQUIREMENTS 01910 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!