12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT01430 – Quality AssuranceIssue Date:September 28, 2012Page #:1 <strong>of</strong> 4REVISION HISTORYRev Description <strong>of</strong> Change DateA For Bidding September 28, 2012SECTION 01430 – QUALITY ASSURANCEPART 1– GENERAL1.1 SUMMARY1. Summary2. Related Sections3. Owner’s Responsibilities4. Contractor’s Responsibilities5. References6. Quality Assurance7. Material Testing Duties1.2 RELATED SECTIONSA. Standard General Conditions <strong>of</strong> the Construction Contract (EJCDC)B. Supplementary General ConditionsC. Section 01340 – SubmittalsD. Section 31230 – Earthwork and Pipe BackfillE. Section 33615 – Hot Water Pipe Distribution SystemF. Appendix A ─ Welding and Testing RequirementsG. Appendix B – Quality Assurance Documents1.3 OWNER’S RESPONSIBILITIES FOR TESTS AND INSPECTIONSA. The OWNER will provide initial weld radiography testing in accordance with theschedule set forth in Appendix A, Section III – Radiography <strong>of</strong> Pipe Welding,QUALITY ASSURANCE014301

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!