MH/CB (Outside Diameter +4ft)^2 x (depth +1’)D. PaymentPayment will be made at the contract unit price per cubic yard, which price shall be full compensation for allinsurance, preFblast surveys, labor, materials, tools and equipment necessary for excavation; drilling;blasting; rock removal; furnishing and placing <strong>of</strong> refill material; hauling and proper disposal <strong>of</strong> excessunsuitable material <strong>of</strong>fFsite; and all other work necessary or incidental to the satisfactory completion <strong>of</strong> thisitem.Bid Item 69^ – Boulder ExcavationA. DescriptionThe work shall consist <strong>of</strong> the removal <strong>of</strong> single boulders larger than one cubic yard in volume which can beexcavated without drilling, blasting, wedging, sledging or barring.B. Method <strong>of</strong> MeasurementThe quantity <strong>of</strong> Boulder Excavation to be measured for payment will be the total number <strong>of</strong> cubic yards <strong>of</strong>boulders greater than one cubic yard that have been removed from excavated areas with commonexcavation equipment and without drilling or blasting.C. Basis <strong>of</strong> PaymentThe accepted quantities as measured will be paid for at the Contract unit price per cubic yard. Payment willbe full compensation for performing the work specified including any necessary refilling with approvedmaterial to the bottom <strong>of</strong> subbase as shown in the Plans or as directed by the Engineer.D. EquipmentAs needed, such as excavators, backhoes, buckets, loaders, etc.Item [13^ ] – 2”x2’ Rigid InsulationA. DescriptionThis item shall consist <strong>of</strong> furnishing all materials labor and equipment necessary to install 2” rigid insulationas shown on plans or directed by the engineer.B. MaterialsMaterials shall meet the requirements <strong>of</strong> specification Section 02200 Earthwork, Part 2 Products.C. MeasurementMeasurement shall be on a linear foot basis for rigid polystyrene foam insulation installed and accepted bythe <strong>City</strong>/Engineer. Measurement shall be the actual number <strong>of</strong> linear feet <strong>of</strong> 2Finch thick, 2Ffoot wide, rigidpolystyrene foam insulation installed within the trench limits as directed by the <strong>City</strong>/Engineer.D. PaymentPayment will be made at the contract unit price per linear foot <strong>of</strong> rigid insulation in place, which price shall befull compensation for all labor, materials, tools and equipment necessary for furnishing and installing theinsulation.Item 70^ A [14^ ], 70^ B and 70^ C– New, Remove and Reset Granite Curb, Bituminous Curb andConcrete CurbA. DescriptionThis item shall consist <strong>of</strong> furnishing all materials labor and equipment necessary to install or reset GraniteCurb, Bituminous Curb and Cast in Place Concrete Curb.<strong>Montpelier</strong> District Heat SystemPage 66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!