12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT15830 – Heating Terminal UnitsIssue Date:September 28, 2012Page #:6 <strong>of</strong> 83. Subbases: Provide 18 gauge steel subbase for vertical units, height asindicated.J. Manufacturer: Subject to compliance with requirements, provide cabinet heaters<strong>of</strong> one <strong>of</strong> the following:1. Airtherm Mfg. Co.2. McQuay Inc.3. Modine Mfg. Co.4. Sterling Radiator; Div. <strong>of</strong> Reed National Corp.5. Trane (The) Co.PART 3 EXECUTION3.1 INSPECTIONA. Examine areas and conditions under which terminal units are to be installed. Donot proceed with work until unsatisfactory conditions have been corrected inmanner acceptable to Installer.3.2 INSTALLATION OF FINNED TUBE RADIATION AND HEATING RADIATORSA. General: Install radiation as indicated, and in accordance with manufacturer'sinstallation instructions.B. Locate finned tube radiation on outside walls as indicated, run cover walltowallunless otherwise indicated.C. Center elements under windows. Where multiple windows occur over units,divide elements into equal segments centered under each window.D. Install end caps where units butt against walls. Install access panels centered infront <strong>of</strong> each shut<strong>of</strong>f valve, balancing cock, or temperature control valve.3.3 INSTALLATION OF CONVECTORSA. General: Install convectors as indicated, and in accordance with manufacturer'sinstallation instructions.HEATING TERMINAL UNITS158306

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!