12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT16010 – Basic Electrical RequirementsIssue Date:September 28, 2012Page #:8 <strong>of</strong> 9number <strong>of</strong> conduits for the circuit required, nor is the location <strong>of</strong> indicated runsintended to show the actual routing <strong>of</strong> conduits.B. If any departures from the Construction Documents are deemed necessary byContractor in order to furnish an efficient, complete and satisfactory installation,details <strong>of</strong> such departures and the reasons therefore shall be brought to theattention <strong>of</strong> Engineer. Do not make departures without prior approval <strong>of</strong> Engineer.Departures from the Construction Documents without the approval <strong>of</strong> theEngineer will be at the Contractors risk. Any corrections to the installation as aresult <strong>of</strong> these departures will be by the Contractor with no cost to the Owner orDesign Pr<strong>of</strong>essionals.3.6 FIELD QUALITY CONTROLA. Provide all labor, materials, testing equipment, electricity, fuel, lights, lubricants,equipment instruments and all other materials required for conducting all tests.B. Check for proper phase sequence and test all parts <strong>of</strong> the electrical system beforeplacing them in service.C. All systems shall test free from short circuits and grounds, shall be free frommechanical and electrical defects, and shall show insulation resistance betweenphase conductors and ground <strong>of</strong> not less than that required by NEC, or asspecified herein.D. All equipment shall have proper neutral connections where required.E. Insulation test equipment, motors, cables, etc., shall pass the Standard InsulationTest established by the IEEE and shall be made before and after all required highpotential tests. All insulation testers shall be <strong>of</strong> the motor driven, direct readingtype, unless otherwise noted.F. Check all motors for proper rotation and all starters for proper overload protectiveelements.G. Test all electrical devices for proper control <strong>of</strong> motors and equipment.H. Lamp all fixtures with lamps as specified and check operation. Conduct all othertests required to secure approval <strong>of</strong> the work from all agencies having jurisdiction.3.7 ADJUST AND CLEANBASIC ELECTRICAL REQUIREMENTS160108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!