12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Title:02370 – Erosion ControlPage #:1 <strong>of</strong> 3REVISION HISTORYRevDescription <strong>of</strong> ChangeEffective DateA For Bidding September 28, 2012SECTION 02370 EROSION CONTROLPART 1 GENERAL1.1 SCOPE OF WORKA. Provide all labor, materials, tools, and equipment and perform all operations necessary t<strong>of</strong>urnish, deploy, and install Erosion Control Measures in the areas indicated on theDrawings or as required by the Engineer or Owner.1.2 RELATED WORK SPECIFIED ELSEWHEREA. Section 02200 Earthwork1.3 SUBMITTALSA. Submit under provisions <strong>of</strong> paragraph 4 in the General Conditions.B. Samples and product specifications for Turf Reinforcement Matting, Erosion ControlMatting and silt fence.C. Certification that products meet the required specifications.D. Manufacturer’s installation recommendations for the Turf Reinforcing Matting and theErosion Control Matting.1.4 MATERIALS STORAGE AND HANDLINGA. The Contractor shall be responsible for the handling, storage and care <strong>of</strong> TurfReinforcement Matting and Erosion Control Matting from the time <strong>of</strong> delivery to the siteuntil final acceptance <strong>of</strong> the completed work by the Owner. The Contractor shall be liablefor all damages to the materials during such time.EROSION CONTROL 02370 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!