B. MaterialsMaterials shall meet the requirements <strong>of</strong> specification Section 02665 Water Systems, Part 2 Products.C. MeasurementMeasurement shall be on a per foot basis for water service lines that need to be relocated in order to allowfor the heat distribution piping installation. Measurement shall be made from between the two points atwhich the elevation <strong>of</strong> the service is changed.D. PaymentPayment shall be made at the contract unit price per foot, which price shall be full compensation for allmaterial, labor, tools and equipment necessary for relocated the water service including clearing andgrubbing, cutting and removal <strong>of</strong> pavement (including cement concrete pavement), excavation (excludingledge and boulder excavation) excavation support, temporary controls, dewatering (including the use <strong>of</strong>crushed stone),bedding, jointing, sheeting and bracing, testing, backfilling, 24” subbase <strong>of</strong> dense gradedcrushed stone, compaction, restoration <strong>of</strong> growth and surface (excluding paving, curb and sidewalk withintrench limits), restoration <strong>of</strong> physical features (including steps and fences) removal, hauling and properdisposal <strong>of</strong> excess and unsuitable material <strong>of</strong>fFsite, and all other work necessary or incidental to thesatisfactory completion <strong>of</strong> this item.Items 61 – 4’ I.D. Pre

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!