12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT01710 – Project Closeout RequirementsIssue Date:September 28, 2012Page #:5 <strong>of</strong> 7horizontal clearance shall be surveyed (minimum <strong>of</strong> two locations forpipes to show all horizontal and vertical alignments), and included onthe survey point data.i. For existing subsurface facilities, utilities, or obstructions, allhorizontal and vertical locations <strong>of</strong> such items that cross or run parallelwith the OWNER’S facilities that have been exposed due to theexcavation shall be surveyed (minimum <strong>of</strong> two locations for pipes toshow all horizontal and vertical alignments). This includes showingthe location <strong>of</strong>:i. Structural foundations or footingsii. Grade beamsiii. Storm seweriv. Water mainv. Sanitary sewervi. Utility Manholes and Vaultsvii. Valve stemsviii. Light, signal, and overhead cantenary pole basesThe excavating contractor will need to identify to the surveyor theutilities that have been exposed below the OWNER’S facilities thatmay be in the trench bedding or hidden from sight.j. Survey any changes to surface features such as adjacent curbs,sidewalks, buildings, and other physical construction that is modifiedfrom the asbid construction documents.4. In addition to the survey points file, the following supplementalinformation shall be provided in the form <strong>of</strong> redline drawings to identifysurvey points and deviations from the Plans:a. Approximate location <strong>of</strong> survey points.b. Isometric sketch <strong>of</strong> any pipe installation that was not performed inaccordance with the Plans (may be combined withradiography/weld location sketch).c. Notation <strong>of</strong> modifications to the Conduit and Handhole layout.5. It is the responsibility <strong>of</strong> the CONTRACTOR to ensure that they secure all<strong>of</strong> the necessary data and information to prepare and submit an accuraterepresentation <strong>of</strong> the work completed in the field. Failure to securerequired data prior to the concealment <strong>of</strong> the work may result in the rePROJECT CLOSEOUT REQUIREMENTS017105

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!