12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Title:02550 – CurbingPage #:12 <strong>of</strong> 13B. MIXING AND PLACING: Compaction <strong>of</strong> concrete placed in the forms shall be byspading or other approved methods. Forms shall be left in place for 24 hours or until theconcrete has set sufficiently so that they can be removed without injury to the curbing.Upon removal <strong>of</strong> the forms, the exposed curbing face shall be dressed finished.C. SECTIONS: Curbing shall be constructed in sections having a uniform length <strong>of</strong> 10 feet(3 m), unless otherwise specified. Sections shall be separated by open joints 1/8 inch (3mm) wide except at expansion joints.D. EXPANSION JOINTS : Expansion joints shall be formed at the intervals shown on thePlans using a preformed expansion joint filler having a thickness <strong>of</strong> 1/4 inch (6 mm).They shall be constructed at 20 feet (6 m) intervals or as directed by the Engineer. Whenthe curb is constructed adjacent to or on concrete pavement, expansion joints shall belocated opposite or at expansion joints in the pavement.E. CURING:1. General: Protect freshly placed concrete from premature drying and excessivecold or hot temperatures.2. Evaporation Control: In hot, dry, and windy weather, protect concrete from rapidmoisture loss before and during finishing operations with an evaporationcontrolmaterial. Apply according to manufacturer's instructions after screeding and bullfloating, but before floating.3. Begin curing after finishing concrete but not before free water has disappearedfrom concrete surface.4. Curing Methods: Cure concrete by moisture curing, moistureretainingcovercuring, curing compound, or a combination <strong>of</strong> these as follows:a. Moisture Curing: Keep surfaces continuously moist for not less than 7 dayswith the following materials:i. Water.ii. Continuous waterfog spray.iii. Absorptive cover, water saturated, and kept continuously wet. Coverconcrete surfaces and edges with a 12inch lap over adjacent absorptivecovers.b. MoistureRetainingCover Curing: Cover concrete surfaces with moistureretaining cover for curing concrete, placed in widest practicable width, withsides and ends lapped at least 12 inches, and sealed by waterpro<strong>of</strong> tape oradhesive. Immediately repair any holes or tears during curing period usingcover material and waterpro<strong>of</strong> tape.5. Curing Compound: Apply uniformly in continuous operation by power spray orroller according to manufacturer's directions. Recoat areas subjected to heavyrainfall within 3 hours after initial application. Maintain continuity <strong>of</strong> coating andrepair damage during curing period.F. BACKFILLING : After the concrete has set sufficiently, the spaces in front andback <strong>of</strong> the curb shall be filled to the required elevation with layers <strong>of</strong> not more than 6inches (150 mm) <strong>of</strong> the same material as the bedding and thoroughly tamped.CURBING 02550 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!