12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:01340 – Submittals<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Page #:6 <strong>of</strong> 123.) Minimum <strong>of</strong> two gigabytes <strong>of</strong> online storage for commondocuments relating to all contracts for the project.4.) Redundant storage <strong>of</strong> all project information (all contracts)at a minimum <strong>of</strong> two geographically separate storage sites(not in the same building).e. Unlimited secure individual user accounts and system access forall project subcontractors, prime contractors, ^ <strong>City</strong> staff, designconsultants, and subconsultants.f. Separate locations for ^ <strong>City</strong> staff, design consultant, andsubconsultant review comments with contractors restricted fromviewing comments until final review or release by ^ <strong>City</strong> staff orprimary design consultants.g. Full version histories and dates <strong>of</strong> exchanges automatically trackedand available for viewing, searching, and reporting in a linear logformat^ .1.) Each Contract’s Submittal Log shall be tracked andmaintained independent <strong>of</strong> the Submittal Logs <strong>of</strong> therelated Contracts.h. Automatic, email reminders <strong>of</strong> past due items to related reviewersby specification and discipline.i. Customized, automated PDF form generation ^ for Transmittal, IB,RFI, and Design & Construction Submittal Comment forms.Documentation and demonstration <strong>of</strong> automatic form generationusing ^ must be submitted for approval.j. Automated workflow processes1.) Two stage review workflows for Submittal, and RFI,Posting Only for IB, CAD Coordination, Minutes, Testing,Closeout, and ^ other documents.2.) Documentation <strong>of</strong> automated workflow processes matchingrequirements must be submitted for approval.k. Functionality to group submittals as required packages and applyforms and review comments to entire package simultaneously.SUBMITTALS 01340 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!