12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT15135 – Meters and GagesIssue Date:September 28, 2012Page #:6 <strong>of</strong> 73.2 INSTALLATION OF PRESSURE GAGESA. Install pressure gages as indicated on the drawings.B. Install pressure gages in piping tee with pressure gage valve, located on pipe atmost readable position.C. Pressure Gage Accessories: Install snubbers in liquid piping systems, siphons insteam piping systems.D. The Drawings are schematic in nature. Install pressure gage accessories asspecified herein as required for the service regardless <strong>of</strong> the Drawing symbology.3.3 INSTALLATION OF TEST PLUGSA. Install test plugs where indicated on the drawings.B. Install test plugs every nozzle <strong>of</strong> each pump, heat exchanger and control valve if apressure gage and thermometer are not present.C. Test Plugs: Install in piping tee where required, located on pipe at most readableposition. Secure cap.3.4 ADJUSTING AND CLEANINGA. Adjusting: Adjust faces <strong>of</strong> meters and gages to proper angle for best visibility.B. Cleaning: Clean windows <strong>of</strong> meters and gages and factory finished surfaces.Replace cracked and broken windows, and repair scratched and marred surfaceswith manufacturer's touchup paint.METERS AND GAGES151356

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!