12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CONSTRUCTION <strong>of</strong> a DISTRICT HEATING SYSTEM, HOT WATER CONVERSION AND CONNECTIONSCITY <strong>of</strong> MONTPELIER, VERMONTSCOPE OF WORK/MEASUREMENT & PAYMENTWork to be performed under this contract consists <strong>of</strong> the construction <strong>of</strong> a thin wall, carbon steel, preFinsulateddistrict heating piping system, ranging from 8” diameter to 1.5” in both system mains and service laterals. This newpiping system will run between the State <strong>of</strong> <strong>Vermont</strong>’s heating plant, through <strong>City</strong> streets and extend to UnionElementary School and <strong>City</strong> Hall, with service laterals and spurs branching <strong>of</strong>f to serve nonF<strong>City</strong> customers. The workincludes restoration <strong>of</strong> the surface conditions after pipe installation. In addition, this project includes converting theUnion Elementary from a low pressure steam heating system to a hot water heating system. Finally, this projectincludes connecting and converting the Police Department and the <strong>City</strong> Hall buildings to the district heating systemand modifying their internal heating systems to use the district hot water.All areas <strong>of</strong> work, and work site descriptions with bid item quantities are outlined on a spreadsheet attachedherewith.Construction will be carried out in accordance with the plans entitled CONSTRUCTION <strong>of</strong> a DISTRICT HEATINGSYSTEM, HOT WATER CONVERSION AND CONNECTIONS prepared by HallamFICS, DeWolfe Engineering and EverFGreen Energy and the Project <strong>Specifications</strong> and as directed and/or as described herein. The standard typical designand construction details referenced for this contract are identified as follows and are attached hereto:VAOT (VTrans) Standard Detail CF2b, CF3, CF3a and CF3Fb;VAOT (VTrans) Standard Detail D20;VAOT (VTrans) Standard Detail EF100, EF100A;Work Zones Traffic Control).GeneralManual <strong>of</strong> Uniform Traffic Control Devices (PedestrianFor unit price items, the Contractor shall be paid for the actual amount <strong>of</strong> work measured and accepted bythe <strong>City</strong>.A. For Lump Sum items, the Contractor shall be required to submit a schedule <strong>of</strong> values breaking out the valuefor each portion <strong>of</strong> the work required under the item. The schedule <strong>of</strong> values will need to be reviewed andapproved by the <strong>City</strong> prior to the start <strong>of</strong> construction. Lump sum items will be paid for the percentage <strong>of</strong>the item that has been completed as described in the schedule <strong>of</strong> values.B. At the end <strong>of</strong> each work day, the Contractor’s representative shall review the quantities measured by theEngineer/<strong>City</strong> representative to ensure agreement.C. The payment period shall be on a monthly basis. At the end <strong>of</strong> each month, the Contractor shall be requiredto submit a payment request for the work completed within the payment period. The <strong>City</strong> will consider biFweekly payment periods on a case by case basis.A 10% contract retainage will be held on the work completed, until the contractor has completed 50% <strong>of</strong> the totalamount <strong>of</strong> work on the contract. Once the Contractor has reached 50% completion, the retainage may bereduced to 5%. The <strong>City</strong> reserves the right to maintain a 10% contract retainage for the duration <strong>of</strong> theproject as circumstances warrant.Bid Item 1 – In

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!