12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating16100 – Site Electrical<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Page #:4 <strong>of</strong> 8A. Rigid nonmetallic conduit shall be PVC or HDPE, Schedule 80 pipe.1. Pipe shall be capable <strong>of</strong> being installed by direct bury, stitching, plowing,trenching, or directional boring methods.2. Pipe shall be GREY in color.3. Pipe shall be marked on the outside surface indicating the manufacturer’sname, size <strong>of</strong> conduit, type <strong>of</strong> material, UL Listing, and any additionalmarkings required by NEC requirements.4. All connection to existing pipe shall consist <strong>of</strong> PVC pipe <strong>of</strong> the samediameter <strong>of</strong> the pipe being connected to. Conduit from existing pipeconnection points shall remain PVC into the nearest handhole.B. Fittings shall be from the same manufacturer as the PVC or HDPE conduit, andbe approved by the manufacture for use on PVC or HDPE pipe as a leakfreeconnections. Butt Fusion joining process is an approved method <strong>of</strong> connection inlieu <strong>of</strong> fittings for HDPE pipe.C. All bends along hot water pipe alignments shall consist <strong>of</strong> longradius sweeps.Sweeps shall be shop or fieldfabricated using heat and a forming methoddetermined by the CONTRACTOR. All sweeps shall have a minimum bendradius <strong>of</strong> 60” (5’), regardless <strong>of</strong> conduit pipe size.D. Factory bends may be used in lieu <strong>of</strong> sweeps to bring conduit vertically up intohandholes. The total measurement <strong>of</strong> all factory bends on a segment <strong>of</strong> conduitpipe between handholes shall not exceed 360degrees. If the total measurement<strong>of</strong> all factory bends exceed 360degrees, the CONTRACTOR shall utilize longradius sweeps in place <strong>of</strong> factory bends as summarized in Part 2.2 (C) <strong>of</strong> thisSection.E. Factory bends shall have a minimum radius <strong>of</strong> 18”.F. Nonmetallic bell ends shall be installed on all ends <strong>of</strong> conduit pipe. Bell endsshall be sized appropriately for the nonmetallic conduit being used forinstallation.G. Upon completion <strong>of</strong> installation, the CONTRACTOR shall install nylon pullstring for each conduit run. The pull string shall be <strong>of</strong> sufficient strength tohandle up to 1250 lbs <strong>of</strong> pull force.2.3 FIBER OPTIC CABLEA. Fiber Optic cable shall be multimode fiber that complies with or exceeds thefollowing specifications:1. IEC 60793210: Type A1b Optical Fiber2. TIA/EIA492AAAAASITE ELECTRICAL161004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!