12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT15995 – Commissioning <strong>of</strong> Mechanical SystemsIssue Date:September 28, 2012Page #:2 <strong>of</strong> 7responsible for commissioning the equipment they install. However, this Contractor shall participate with the State’s engaged contractors for a complete distribution system commissioning effort.1.4 SUBMITTALSA. Refer to Division 01 Section “Submittals” for specific requirements.B. In addition, provide the following:1. Certificates <strong>of</strong> readiness2. Certificates <strong>of</strong> completion <strong>of</strong> installation, prestart, and startup activities.3. O&M manuals4. Contractor and equipment startup and test reports5. Completed construction checklistsPART 2PRODUCTS2.1 TEST EQUIPMENTA. All standard testing equipment required to perform startup, initial checkout andfunctional performance testing shall be provided by the contractor for the equipment being tested. For example, the mechanical contractor <strong>of</strong> Division 22 shallultimately be responsible for all standard testing equipment for the mechanicalsystem in Division 22, except for equipment specific to and used by TAB in theircommissioning responsibilities. A sufficient quantity <strong>of</strong> twoway radios shall beprovided by each subcontractor.B. Refer to Division 01 Section 019110 “General Commissioning Requirements” fora detailed description <strong>of</strong> test equipment requirements.PART 3EXECUTION3.1 GENERAL DOCUMENTATION REQUIREMENTSA. With assistance from the installing contractors, the CxA will prepare PreFunctional Checklists for all commissioned components, equipment, and systems.B. Redlined Drawings:1. The contractor will verify all equipment, systems, instrumentation, wiringand components are shown correctly on redlined drawings.MECHANICAL SYSTEM COMMISSIONING REQUIREMENTS 15995 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!