12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT15010 – Basic Mechanical RequirementsIssue Date:September 28, 2012Page #:8 <strong>of</strong> 13conditions and the installed work <strong>of</strong> all other trades and verify that all conditionsand all such work is complete to the point where the mechanical work mayproperly commence.B. Verify that mechanical work may be done in complete accordance with allpertinent laws, codes, regulations and the design.C. In the event <strong>of</strong> discrepancy, immediately notify OWNER’S Representative.D. Do not proceed with the work in areas <strong>of</strong> discrepancy until all such discrepancieshave been fully resolved.3.2 MECHANICAL INSTALLATIONSA. Layout all work at the site by consultation with other trades before installing workto eliminate any conflict between this work and work <strong>of</strong> other trades.B. Coordinate mechanical work, in advance, with other work. The installation <strong>of</strong>chases, openings, etc., required for mechanical equipment, shall be done at suchtime as to minimize the need for any subsequent cutting and patching. Prior to theordering <strong>of</strong> any equipment, verify the location, type and characteristics <strong>of</strong>connections to be furnished.1. Verify all dimensions by field measurements.2. Arrange for chases, slots, and openings in other building componentsduring progress <strong>of</strong> construction, to allow for mechanical installations.3. Coordinate the installation <strong>of</strong> required supporting devices and sleeves tobe set in pouredinplace concrete and other structural components, as theyare constructed.4. Sequence, coordinate, and integrate installations <strong>of</strong> mechanical materialsand equipment for efficient flow <strong>of</strong> the Work. Give particular attention tolarge equipment requiring positioning prior to closing in the building.5. Where mounting heights are not detailed or dimensioned, install systems,materials, and equipment to provide the maximum headroom possible.6. Coordinate connection <strong>of</strong> mechanical systems with exterior undergroundand overhead utilities and services. Comply with requirements <strong>of</strong>governing regulations, franchised service companies, and controllingBASIC MECHANICAL REQUIREMENTS150108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!