12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT01430 – Quality AssuranceIssue Date:September 28, 2012Page #:2 <strong>of</strong> 4Part 7. Additional weld testing, if required due to failing welds, costs for anyretesting shall be reimbursed to the OWNER by the CONTRACTOR.1.4 CONTRACTOR’S RESPONSIBILITIESA. The CONTRACTOR is responsible for providing all other project quality control,and will be responsible for performing and documenting all remaining materialtesting using an independent testing laboratory.B. Design preliminary mixes required by Contract Documents for fieldplacedconcrete (H20/HS25 Loading Slabs, Footings, Concrete Structures, etc.).C. Establishment <strong>of</strong> an inspection and testing plan for the hot water distributionsystem. This plan shall include all items requiring testing and inspection inaccordance with Section 33615 and Appendix A. See Appendix B for samples <strong>of</strong>inspection and testing plans.D. Tests required establishing conformance <strong>of</strong> soils including optimum moisturecontent, material analysis and compaction requirements.E. The CONTRACTOR shall arrange and pay for all tests and inspections requiredfor performance <strong>of</strong> the Work, including the following:1. Tests and inspections associated with hydrostatic testing and/or liquidpenetrant testing in accordance with the provisions set forth in AppendixA.2. Tests and inspections <strong>of</strong> materials, products, or equipment to certifycompliance with Contract Documents, before incorporation into the Work.3. Tests, inspections, or laboratory services necessary with respect tosubstitutions.4. Tests and inspections required by public authorities as part <strong>of</strong> permits orinspection fees.5. Other tests and inspections indicated to be “by CONTRACTOR”.6. Additional tests and inspections when initial tests or inspections indicateWork does not comply with Contract Documents will be completed at theCONTRACTOR’S expense.F. Secure and deliver to laboratory adequate quantities <strong>of</strong> representational samples<strong>of</strong> materials proposed to be used and required testing.G. Cooperate with laboratory personnel. Provide access to Work and manufacturer’sfacilities.QUALITY ASSURANCE014302

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!