12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Title:15900 – Direct Digital Control SystemPage #:40 <strong>of</strong> 4011. System Operating Procedures.12. Programming Procedures.13. Maintenance Procedures.D. Training III. The third training will be conducted onsite six months after occupancyand consist <strong>of</strong> two 2hour sessions <strong>of</strong> training. The sessions will be structured toaddress specific topics that trainees need to discuss and to answer questions concerningoperation <strong>of</strong> the system.E. The owner will assign a total <strong>of</strong> 6 individuals to receive training. All appropriatemanuals must be provided.F. Controls Commissioning:1. At the end <strong>of</strong> the construction phase, commission the building in the presence <strong>of</strong>a representative <strong>of</strong> the Owner. At this time, demonstrate that all controlcomponents operate properly by illustrating their operation via a Contractortechnician operating the host terminal to verify the status <strong>of</strong> each point with aseparate technician at the point being verified, with twoway communicationbetween technicians. To verify each point:a. The technician at the terminal will communicate the status <strong>of</strong> the point tothe technician at the point. The technician at the point will verify,through observation or measurement, whether the status is correct.b. The technician at the terminal will then cause the status <strong>of</strong> the point tochange, and the technician shall verify:1.) The status <strong>of</strong> the point did change, through observation ormeasurement.2.) The status changed in the correct direction.2. Correct any deficiencies encountered, and reverify. Record any changes in theproject record documents.3. Work with balancing contractor to calibrate all DDC flow monitoringcomponents.4. Approximately 68 months after the date <strong>of</strong> Substantial Completion coordinatewith the Owner and return to the building and recommission the buildingincluding:a. Modification <strong>of</strong> the control sequences and operations to fine tune thesystems per the requirements <strong>of</strong> the Owner.b. Verification <strong>of</strong> the proper operation <strong>of</strong> all control components ands<strong>of</strong>tware.c. Modification <strong>of</strong> the project record documents to reflect all changes andrevisions made to date.END OF SECTION 15900DIRECT DIGITAL CONTROL SYSTEMS1597240

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!