12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Title:APPENDIX A – Welding and Testing RequirementsPage #:20 <strong>of</strong> 22V. HYDROSTATIC TESTING OF PIPING WELDSWhere required as part <strong>of</strong> the construction contract, the CONTRACTOR shall be responsible fornotification to the <strong>City</strong> <strong>of</strong> <strong>Montpelier</strong> Mechanical Inspection Department <strong>of</strong> all proposedhydrostatic testing.The CONTRACTOR is responsible for all costs associated with hydrostatic testing. TheCONTRACTOR shall refer to Appendix A, Section II, Paragraph 18.1.3. for the use <strong>of</strong> liquidpenetration testing in lieu <strong>of</strong> hydrostatic testing.The CONTRACTOR shall be responsible for notifying the ENGINEER at least 24 hours prior tothe proposed start <strong>of</strong> hydrostatic testing.A copy <strong>of</strong> the Hydrostatic Testing Record can be found in Appendix B. Hard copies will beprovided to the CONTRACTOR by the OWNER upon request.1.0 PROCEDURE REQUIREMENTS1.1 Leak testing shall be performed in accordance with the Specification and therequirements <strong>of</strong> ANSI B31.1, Section 137.1.2 All leak testing performed on the piping system shall be hydrostatic testing,unless the procedures <strong>of</strong> Appendix A, Section II, Paragraph 18.1.3 are followedby the CONTRACTOR.1.3 The CONTRACTOR shall develop a procedure for hydrostatic testing andsubmit it to the ENGINEER for review and release prior to any hydrostatictesting occurring.2.0 EXAMINATION PROCEDURE2.1 After the joints have been welded and the pipe has been placed in its finalposition in the piping system, but before the pipe coating and/or insulation isapplied, the CONTRACTOR shall Leak Test all joints.2.2 All welded joints shall be open, clean and accessible for circumferentialinspection prior to the start <strong>of</strong> and during hydrostatic testing.2.3 The CONTRACTOR shall furnish and install suitable temporary testing plugs orcaps for the pipeline, all necessary bracing, pressure pumps, pipe connections,meters, calibrated gages and other similar equipment, and all labor required.2.4 The meter and gage shall be installed by the CONTRACTOR in such a mannerthat all water entering the section under test will be measured and the pressurein the section indicated, and shall be kept in use during the test.2.5 The section <strong>of</strong> pipe to be tested shall be filled with water <strong>of</strong> approved quality.2.6 All air shall be expelled from the pipe.2.6.1 If air releases or blow-<strong>of</strong>fs are not available at high points for releasingair, or if drains or blowdowns are not available at low points for drainingwater, the CONTRACTOR may, with the prior approval <strong>of</strong> theENGINEER, add the necessary permanent attachments in accordancewith Appendix A, Section II, Paragraphs 11.1, 11.2, and 11.3, to properlyconduct the test.2.6.1.1 All permanent attachments shall be properly plugged uponcompletion <strong>of</strong> the test.APPENDIX APage A20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!