12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT019110 – General Commissioning RequirementsIssue Date:October 17, 2012Page #:21 <strong>of</strong> 30C. The CxA may request additional design narrative from the engineer and controlscontractor, depending on the completeness <strong>of</strong> the OPR documentation and sequences provided with the specifications.D. These submittals to the CxA do not constitute compliance for O&M manual documentation. The O&M manuals are the responsibility <strong>of</strong> the contractor, thoughthe CxA will review and approve them.3.4 PHASED COMMISSIONING (IF REQUIRED)A. If the project requires TAB, startup and performance testing to be executed inphases. Phasing shall be coordinated with the Owner/CM, CxA, and engineer andbe reflected in the overall project schedule and commissioning schedule by thecontractor. Final performance testing <strong>of</strong> all systems will be as required by thephasing plan. The performance testing <strong>of</strong> the “systems as a whole” will be performed before final turnover <strong>of</strong> the entire project.3.5 PERFORMANCE TESTINGA. Requirements. The performance testing shall demonstrate that each system is operating according to the documented design intent and contract documents. Performance testing facilitates bringing the systems from a state <strong>of</strong> individual substantial completion to full dynamic operation. Additionally, during the testingprocess, areas <strong>of</strong> deficient performance are identified and corrected, improvingthe operation and functioning <strong>of</strong> the systems. Performance testing only commences after the contractors have declared the systems and sequence <strong>of</strong> operations havebeen started, programmed, tested and checked out. Signing <strong>of</strong> the constructionchecklist is the declaration that the systems are ready for performance testing bythe CxA.B. Coordination and Scheduling. The contractor shall provide sufficient notice, regarding their completion schedule for the construction checklists and startup <strong>of</strong> allequipment and systems to allow the performance testing to be scheduled. Thecommissioning team shall oversee, witness, and document the performance allequipment and systems. The CxA in association with the contractor/subcontractors and facility staff shall execute the tests. Performance testingshall be conducted after the construction checklists, and startup has been satisfactorily completed. The control system shall be sufficiently tested and approved bythe CxA before it is used, to verify performance <strong>of</strong> other components or systems.The air balancing and water balancing shall be completed before performancetesting <strong>of</strong> air or waterrelated equipment or systems. Testing proceeds from components to subsystems to systems. When the proper performance <strong>of</strong> all interactGENERAL COMMISSIONING REQUIREMENTS 01910 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!