12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT01660 – Product Storage & Handling RequirementsIssue Date:September 28, 2012Page #:2 <strong>of</strong> 3B. Handle, install, connect, clean, condition, and adjust products in accordance withsuch instructions and in conformity with <strong>Specifications</strong>. If Project conditions or<strong>Specifications</strong> conflict with manufacturer’s instructions, consult with theOWNER’s Representative for direction. Do not proceed with Work without clearinstructions.C. Perform Work in accordance with manufacturer’s instructions. Do not omit anypreparatory step or installation procedure unless expressly modified or exemptedby Contract Documents or the Owner’s Representative.D. Should a conflict exist between specifications and instructions, consult withOwner’s Representative for direction.1.4 TRANSPORTATION AND HANDLINGA. The CONTRACTOR shall be responsible for transport <strong>of</strong> the necessary materialsto the project site.B. Deliver products in undamaged condition, in manufacturer’s original containers orpackaging, and with identifying labels intact and legible.C. Immediately upon delivery, inspect shipments to ensure compliance withrequirements <strong>of</strong> Contract Documents and approved submittals, and to ensure thatproducts are properly protected and undamaged.D. The CONTRACTOR shall be responsible for providing all equipment andsufficient personnel to handle products at time <strong>of</strong> pickup, delivery, and onsitestorage.E. The CONTRACTOR shall handle, haul, and distribute all materials and allsurplus materials on the different portions <strong>of</strong> the Work, as necessary or requiredand shall be responsible for the protection, loss <strong>of</strong>, or damage to materials andequipment furnished by the CONTRACTOR or others until Final Completion andacceptance <strong>of</strong> the Work. CONTRACTOR and all subcontractors are responsiblefor all damaged items caused by their respective employees and agents (includingsubcontractors) and shall replace all such damaged items without additional costto OWNER.F. The CONTRACTOR shall deliver all surplus materials to the location designatedby the OWNER at no additional cost at the completion <strong>of</strong> the Work.G. The CONTRACTOR shall arrange with material suppliers and manufacturers fordelivery and entry <strong>of</strong> equipment to the site at a suitable time. Inform appropriateparties <strong>of</strong> the size <strong>of</strong> access available for equipment so assembly <strong>of</strong> large units <strong>of</strong>equipment on site may be considered when they are being manufactured.PRODUCT STORAGE AND HANDLING REQUIREMENTS016602

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!