12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT019110 – General Commissioning RequirementsIssue Date:October 17, 2012Page #:15 <strong>of</strong> 30Occupancy and Operations Phase1. Ensure that subcontractors provide assistance for seasonal or deferred performance testing, performed by the CxA, according to the specifications.2. Ensure that subcontractors correct deficiencies and make necessary adjustments toO&M manuals and asbuilt drawings for applicable issues identified in any seasonal testing.3. Perform all guarantee work for materials furnished under the contract for the timespecified in the contract, including all warranties and curing all latent defectswithin the time period provided in the contract.H. Vendors/Subcontractors1. Provide all requested submittal data, including detailed startup procedures andspecific responsibilities <strong>of</strong> the Owner to keep warranties in force.2. Assist in equipment testing per agreements with subcontractors and/or contractor.3. Include cost <strong>of</strong> all special tools and instruments (only available from vendor, specific to a piece <strong>of</strong> equipment) required for testing, operating, and maintainingequipment according to these contract documents in the base bid price to the contractor.4. Analyze specified products and verify that the engineer has specified the newest,most current equipment reasonable for this project’s scope and budget.5. Provide requested information regarding equipment sequence <strong>of</strong> operation andtesting procedures.6. Review construction checklists and test procedures for equipment installed by factory representatives.1.11 EQUIPMENT/SYSTEMS TO BE COMMISSIONEDA. The following equipment/systems will be commissioned in this project:1. All Mechanical Systems, Equipment, Devices, and Componentsa. Fans, pumps, controls, piping, valves, insulation, chemical treatment, air handlers, fan filter units, chillers, terminal boxes, converters, etc.2. Control Systems, including Graphics, Displays, Trending and AlarmingEquipmentGENERAL COMMISSIONING REQUIREMENTS 01910 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!