12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:02200 – Earthwork<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Page #:3 <strong>of</strong> 161.5 QUALITY ASSURANCEA. Codes and Standards: Perform earthwork complying with requirements <strong>of</strong> authoritieshaving jurisdiction.B. Testing and Inspection Service: Employ a qualified independent geotechnicalengineering testing agency to classify proposed onsite and borrow soils to verify thatsoils comply with specified requirements and to perform required field and laboratorytesting.1.6 PROJECT CONDITIONSA. Existing Utilities: Do not interrupt existing utilities serving facilities occupied by theOwner or others except when permitted in writing by the Owner and then only afteracceptable temporary utility services have been provided.1. Provide a minimum <strong>of</strong> 48 hours notice to the Engineer and receive written notice toproceed before interrupting any utility.B. Demolish and completely remove from site existing underground utilities indicated to beremoved. Coordinate with utility companies to shut<strong>of</strong>f services if lines are active.PART 2PRODUCTS2.1 SOIL MATERIALSA. General: Provide approved borrow soil materials from <strong>of</strong>fsite when sufficient approvedsoil materials are not available from excavations.B. All soils shall be free <strong>of</strong> loam, debris, waste, frozen materials, vegetation and otherdeleterious matter.C. Sand for Cushion, Backfill, and pipe bedding shall consist <strong>of</strong> material reasonably freefrom silt, loam, clay, organic matter. It shall be obtained from approved sources and shallmeet the requirements <strong>of</strong> the following table:Gradation Requirements for Sand Borrow and CushionSIEVE DESIGNATIONPERCENTAGE BY MASS (WEIGHT)PASSING SQUARE MESH SIEVES^^37.5 mm (1 ½ inch) 90 to 10012.5 mm (1/2 inch) 70 to 1004.75 mm (No. 4) 60 to 100150 µm (No. 100) 0 to 2075 µm (No. 200) 0 to 8EARTHWORK 02200 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!