12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

formwork; steel reinforcement for thrust restraints and head walls, as shown on Detail Drawings; curingconcrete; removal <strong>of</strong> formwork; and all other work necessary or incidental to the satisfactory completion <strong>of</strong>this item.Item 65 [10] – Unsuitable Material with Gravel RefillE. DescriptionThis item shall consist <strong>of</strong> furnishing all labor and equipment necessary to remove unsuitable materials belowthe normal trench depth as directed by the <strong>City</strong>/Engineer.F. MaterialsPer Division II, Specification Section 02140 Dewatering, 02160 – Excavation Support Systems and 02200 –Earthwork.G. MeasurementMeasurement shall be on a cubic yard basis for gravel backfill placed and accepted by the <strong>City</strong>. Measurementshall be the actual number <strong>of</strong> cubic yards <strong>of</strong> crushed gravel backfill in place, above the blanket and below theroad subbase, within the trench limits as directed by the <strong>City</strong>/Engineer.H. PaymentPayment shall be made at the contract unit price per cubic yard, which price shall be full compensation for allmaterials, labor, tools and equipment necessary for excavation, hauling and proper disposal <strong>of</strong> materialdeemed unsuitable by the <strong>City</strong>/Engineer <strong>of</strong>fFsite and furnishing, placing and compaction <strong>of</strong> gravel refill; andall other work necessary or incidental to the satisfactory completion <strong>of</strong> this item.Item 66 [11]– Exploratory ExcavationA. DescriptionThe work shall consist <strong>of</strong> trench excavation to locate underground utility services and/or other structures asdirected by the engineer. The Contractor shall utilize protective measures during this excavation to avoiddamage to any underground service or structure. When necessary, the Contractor shall cooperate withrepresentatives <strong>of</strong> the utility companies in order to avoid damage to the utilities by permitting the utilitycompanies to erect suitable supports, props, shoring or other means <strong>of</strong> protection.B. MaterialsPer Division II, Specification Section 02140 Dewatering, 02160 – Excavation Support Systems and 02200 –Earthwork.C. MeasurementMeasurement shall be on a cubic yard basis for exploratory excavation performed and after acceptance bythe <strong>City</strong>/Engineer. Measurement shall be the actual number <strong>of</strong> cubic yards <strong>of</strong> test pit excavation performedto locate existing utilities as directed by the <strong>City</strong>/Engineer. Excavation requiring more than one handlingprior to final placement in embankments will not be measured for payment for the additional handling unlessspecifically stated in the contract.D. PaymentPayment shall be made at the contract unit price per cubic yard, which price shall be full compensation forall materials, labor, tools and equipment necessary for performing exploratory excavation including clearingand grubbing, cutting and removal <strong>of</strong> pavement (including cement concrete pavement); excavation(excluding rock and boulder excavation); excavation support; temporary controls; dewatering (including the<strong>Montpelier</strong> District Heat SystemPage 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!