12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT16050 – Basic Electrical Materials and MethodsIssue Date:September 28, 2012Page #:3 <strong>of</strong> 7proper installation <strong>of</strong> the work, the Contractor shall provide all such cutting,channeling or drilling and will be responsible for any necessary patching andrepairing resulting from the cutting, channeling or drilling, unless noted otherwiseon the Drawings.B. Contractor shall be responsible for any drilling for anchors and/or supportsrequired for conduit, raceways or other electrical work.1.7 EXISTING ELECTRICAL SYSTEMA. In general, portions <strong>of</strong> the existing electrical system shown on the plans to beremoved, shall be removed in phases to prevent system shutdown, unless notedotherwise on the drawings, in areas <strong>of</strong> remodeling and renovation.B. All existing electrical work that is not specifically indicated on the plans to beremoved, but conflicts with proposed alterations and modifications to thebuildings, mechanical, or electrical systems, shall be relocated as required.C. Any device which is to remain but becomes deenergized by removal <strong>of</strong> existingwork shall be rewired and/or reconnected as required to maintain service to thedevice in question.1.8 PROJECT CONDITIONSA. Conditions Affecting Selective Demolition: The following project conditionsapply:1. Protect adjacent materials indicated to remain. Install and maintain dustand noise barriers to keep dirt, dust, and noise from being transmitted toadjacent areas. Remove protection and barriers after demolition operationsare complete.2. Locate, identify, and protect electrical services passing through demolitionarea and serving other areas outside the demolition limits. Maintainservices to areas outside demolition limits. When services must beinterrupted, install temporary services for affected areas.3. The contractor shall maintain any process equipment, utility, etc.,necessary to maintain continuous treatment. Any such equipment thatmust be relocated, either temporarily or permanently, or any processequipment, utilities, etc., that must be installed, either temporarily orpermanently, to maintain wastewater or sludge treatment shall be theBASIC ELECTRICAL MATERIAL AND METHODS160503

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!