12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating16140 – Wiring Devices<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Page #:5 <strong>of</strong> 6accordance with recognized industry practices to fulfill project requirements.B. Coordinate with other work, including painting, electrical boxes and wiringinstallations, as necessary to interface installation <strong>of</strong> wiring devices with otherwork.C. Install wiring devices only in electrical boxes which are clean; free from buildingmaterials, dirt, and debris.D. Install wiring devices after wiring work is completed.E. Where two light switches are controlling two separate 277 volt circuits and areganged together, Contractor shall furnish and install barriers between switches.F. Where two or more switches or other similar wiring devices are indicated at asingle location, they shall be installed under one multiple gang device plate and inan order appropriate to the location <strong>of</strong> the fixtures or devices being controlled.G. Duplex receptacles shall be mounted in a vertical position, unless noted otherwiseon the Drawings.H. Tighten connectors and terminals, including screws and bolts, in accordance withequipment manufacturer's published torque tightening values for wiring devices.Where manufacturer's torquing requirements are not indicated, tighten connectorsand terminals to comply with tightening torques specified in UL Standard 486A.Use properly scaled torque indicating hand tool.3.2 PROTECTIONA. Protect installed components from damage. Replace damaged items prior to finalacceptance.3.3 FIELD QUALITY CONTROLA. Testing: Prior to energizing circuits, test wiring for electrical continuity, and forshortcircuits. Ensure proper polarity <strong>of</strong> connections is maintained. Subsequentto energizing, test wiring devices and demonstrate compliance with requirements,operating each operable device at least six times.B. Test ground fault interrupter operation with both local and remote faultsimulations in accordance with manufacturer recommendations.WIRING DEVICES161405

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!