12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT16050 – Basic Electrical Materials and MethodsIssue Date:September 28, 2012Page #:2 <strong>of</strong> 71.3 SUBMITTALS4. Firestopping materials for sealing penetrations in fire and smoke barriers,floors and foundation walls.A. General: Submit the following in accordance with Conditions <strong>of</strong> Contract andDivision 1 Specification Sections.1. Product data for the following products:a. Joint sealers.B. Shop drawings detailing fabrication and installation for metal fabrications, andwood supports and anchorage for electrical materials and equipment.C. Schedules indicating proposed methods and sequence <strong>of</strong> operations for selectivedemolition prior to commencement <strong>of</strong> Work. Include coordination for shut<strong>of</strong>f <strong>of</strong>electrical service, and details for dust and noise control.1. Coordinate sequencing with construction phasing and Owner occupancyspecified in Division 1.1.4 DELIVERY, STORAGE, AND HANDLINGA. Deliver joint sealer and firestopping materials in original unopened containers orbundles with labels informing about manufacturer, product name and designation,color, expiration period for use, pot life, curing time, and mixing instructions formulticomponent materials.B. Store and handle joint sealer and firestopping materials in compliance with themanufacturers' recommendations to prevent their deterioration and damage.1.5 EQUIPMENT BEING REMOVEDA. All electrical equipment designated by the Owner to be kept, shall be turned overto the Owner at a location on the premises. All other material shall be disposed <strong>of</strong><strong>of</strong>f site by the Contractor at no additional cost to the Owner.1.6 REPAIR OF EXISTING WORKA. The work shall be carefully laid out in advance and where cutting, channeling,drilling <strong>of</strong> floors, walls, partitions, ceilings, or other surfaces is necessary for theBASIC ELECTRICAL MATERIAL AND METHODS160502

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!