12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT16010 – Basic Electrical RequirementsIssue Date:September 28, 2012Page #:6 <strong>of</strong> 9A. General: Sequence, coordinate, and integrate the various elements <strong>of</strong> electricalsystems, materials, and equipment.B. Comply with the following requirements:1. Coordinate electrical systems, equipment, and materials installation withother building components. Comply with the following requirements:2. Verify all dimensions by field measurements.3. Arrange for chases, slots, and openings in other building componentsduring progress <strong>of</strong> construction, to allow for electrical installations.4. Coordinate the installation <strong>of</strong> required supporting devices and sleeves tobe set in pouredinplace concrete and other structural components, as theyare constructed.5. Sequence, coordinate, and integrate installations <strong>of</strong> electrical materials andequipment for efficient flow <strong>of</strong> the work. Give particular attention to largeequipment requiring positioning prior to closing in the building.6. Where mounting heights are not detailed or dimensioned, install systems,materials, and equipment to provide the maximum headroom possible.7. Coordinate connection <strong>of</strong> electrical systems with exterior underground andoverhead utilities and services. Comply with requirements <strong>of</strong> governingregulations, franchised service companies, and controlling agencies.Provide required connection for each service.8. Install systems, materials, and equipment to conform with approvedsubmittal data to greatest extent possible. Conform to arrangementsindicated by the Contract Documents, recognizing that portions <strong>of</strong> thework are shown only in diagrammatic form.9. Install systems, materials, and equipment level and plumb, parallel andperpendicular to other building systems and components, where installedexposed in finished spaces.10. Where concealed work is designated, conceal the work within walls,floors, ceilings, or underground.11. Switches, receptacles, control stations and other control and wiringBASIC ELECTRICAL REQUIREMENTS160106

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!