12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating15510 – Hydronic Piping<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VTIssue Date:September 28, 2012Page #:11 <strong>of</strong> 14D. Install drain valves at low points in mains, risers, branch lines, and elsewhere asrequired for system drainage.3.6 HYDRONIC SPECIALTIES INSTALLATIONA. Install air vents at high points in the system, heat transfer coils, and elsewhere asrequired for system air venting.B. Install pump discharge valves with stem in upward position; allow clearanceabove stem for check mechanism removal.C. Install compression tanks above air separator. Install tank fitting in tank bottomand charge tank. Use manual vent for initial fill to establish proper water level intank.D. Install diaphragm type expansion tanks as indicated. Vent and purge air fromhydronic system, charge tank with proper air charge to suit system designrequirements. Use pipe size as recommended by the tank manufacturer.E. Install balancing valves per the manufacturer’s written instructions and thefollowing criteria:1. A minimum <strong>of</strong> 5 pipe diameters upstream and 2 pipe diametersdownstream <strong>of</strong> the balancing valve to a pipe fitting or another valve.2. A minimum <strong>of</strong> 10 pipe diameters upstream <strong>of</strong> the valve to a pump and aminimum <strong>of</strong> 5 pipe diameters downstream <strong>of</strong> the valve to a pipe fitting oranother valve when the balancing valve is downstream to a pump.F. Install Chemical Shot Feeders (Filter Feeders) per manufacturer’srecommendation.3.7 FIELD QUALITY CONTROLA. Preparation for testing: Prepare hydronic piping in accordance with ASMEB31.9 and as follows:1. Leave joints including welds uninsulated and exposed for examinationduring the test.2. Provide temporary restraints for expansion joints that cannot sustain theHYDRONIC PIPING 15510 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!